56 Transportation, storage and disposal
•
Observe the center of gravity (see the
ACS580MV Gravity Center for Packing
).
•
Lift the cabinet slowly and steadily to the required clearance height maintaining the
cabinet in upright position.
•
Check the horizontal position of the cabinet. Reposition the slings, if necessary.
Using a forklift
•
Only transport the cabinet with the long side facing the driving direction.
•
Use forks with sufficient length to ensure stable transportation and to prevent tipping.
1
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...