Transportation, storage and disposal 55
Using a crane
•
Use lifting equipment (e.g, web slings, chain slings, round slings, safety hooks,
shackles) that corresponds to the weight of the cabinet.
•
Use a metal beam through the holes in the base frame.
•
Use appropriate safety hooks or shackles to attach a sling.
•
Do not pass a sling through the fastening hole.
•
Verify that the slope angle (1 in figure below) corresponds to the weight of the cabinet.
6.6R3
2571
1176
1815
1250
2571
1176
2215
2450
6.6R4
2571
1176
1815
1350
2571
1176
2215
2950
6.6R5
2571
1176
1815
1400
2571
1176
2215
3400
6.6R6
2571
1176
1815
1450
2571
1176
2415
4150
6.6R7
2571
1376
3415
2800
2571
1376
2615
5000
6.6R8
2571
1376
3415
2900
2571
1376
2815
6600
6.6R9
2571
1376
3415
3200
2571
1376
3215
8150
10R1
2571
1176
1815
1200
2571
1176
2215
2100
10R2
2571
1176
1815
1250
2571
1176
2215
2450
10R3
A/B/C
2571
1176
1815
1300
2571
1176
2215
2800
10R3D
2571
1176
1815
1350
2571
1176
2215
3050
10R4
2571
1176
2215
1550
2571
1176
2215
3550
10R5
2571
1176
2215
1600
2571
1176
2415
4300
10R6
2571
1176
2215
1650
2571
1176
2415
4950
10R7
2571
1376
3815
3400
2571
1376
2815
6700
10R8
2571
1376
3815
3500
2571
1376
3215
8800
10R9
2571
1376
3815
3800
2871
1376
3215
10800
10.5/11 R1
2571
1176
1815
1250
2571
1176
2215
2250
10.5/11 R2
2571
1176
1815
1300
2571
1176
2215
2700
10.5/11 R3
2571
1176
1815
1350
2571
1176
2215
3050
10.5/11 R4
2571
1176
2215
1600
2571
1176
2215
4000
10.5/11 R5
2571
1176
2215
1650
2571
1176
2415
4350
10.5/11 R6
2571
1176
2215
1700
2571
1176
2415
5500
10.5/11 R7
2571
1376
4615
4000
2571
1376
2815
7200
10.5/11 R8
2571
1376
4615
4200
2571
1376
3215
9200
10.5/11 R9
2571
1376
4615
4500
2871
1376
3215
11600
Type
Drive unit
Transformer unit
Height
(mm)
Depth
(mm)
Width
(mm)
Weight
(kg)
Height
(mm)
Depth
(mm)
Width
(mm)
Weight
(kg)
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...