32 Function and hardware description
Each power module integrates in one single housing a
•
6 pulse diode rectifier bridge
•
DC circuit
•
inverter IGBTs
•
gate driver electronics.
The active 3-phase unit is designed as a self-commutated, multi-level voltage source
inverter. As a result of the multi-level topology, the drive produces an optimum number of
switching levels - e.g. 21 level for 6 kV, 33 level for 10 kV, phase to phase.
The resulting waveforms permit the use of standard motors.
Output current and voltage waveforms for 10 kV, 50 Hz
Charging circuit
The DC link capacitor is charged via the charging resistor R1 when the MCB is closed and
the drive is connected to the main power supply. Thus, excessive inrush currents are
prevented.
The charging sequence is started by pressing the
SUPPLY ON
pushbutton on the control
compartment door. After the charging sequence has finished, the charging resistor is
bypassed and the DC link will reach its nominal level. The drive then is in status
Stopped
.
When the DC link has been charged, it is possible to keep the drive in this state to facilitate
a more rapid start-up procedure.
Discharging the power modules
Discharging is initiated by pressing the
SUPPLY OFF
pushbutton on the control
compartment door. The energy stored in the DC link is dissipated in the resistors of the
power part of the drive. For safety reasons, the cabinet doors are locked for 15 minutes
1
Output current
2
Output voltage
2
1
Содержание ACS580MV
Страница 1: ...ABB industrial drives Hardware manual ACS580MV drives 200 kW to 6300 kW 6 kV to 11 kV...
Страница 4: ......
Страница 10: ...10...
Страница 50: ...50 Control system and interfaces...
Страница 52: ...52 Guidelines for planning the electrical installation...
Страница 77: ...Electrical installation 77 Power cable entry from top 1 screen extensions to ground 1...
Страница 90: ...90 Installation checklist...
Страница 125: ...Maintenance 125 5 Disconnect the fiber optic links from the power module 1 Hoist 2 screw M8X20 1 2...
Страница 127: ...Maintenance 127 stops it again 10 Connect the second lifting belts to the lifting eyes provided on the power module...
Страница 142: ...142 Maintenance...
Страница 144: ......
Страница 146: ...Contact us 2UBB004520 Rev E EN 2019 06 27 www abb com drives www abb com drivespartners...