Planning the electrical installation 39
5
Planning the electrical
installation
What this chapter contains
The chapter contains the instructions that you must follow when checking the
compatibility of the motor and drive, and selecting cables, protections, cable routing
and way of operation for the drive.
Note:
The installation must always be designed and made according to applicable
local laws and regulations. ABB does not assume any liability whatsoever for any
installation which breaches the local laws and/or other regulations. Furthermore, if the
recommendations given by ABB are not followed, the drive may experience problems
that the warranty does not cover.
Implementing the AC power line connection
See the requirements in section
Electric power network specification
on page
Use a fixed connection to the AC power line.
WARNING!
As the leakage current of the device typically exceeds 3.5 mA, a
fixed installation is required according to IEC 61800-5-1.
Using an input choke
An input choke is required in case of unstable supply networks. An input choke can
also be used for decreasing the input current.
Содержание ACS355 series
Страница 1: ...ABB machinery drives User s manual ACS355 drives ...
Страница 4: ......
Страница 16: ...16 ...
Страница 32: ...32 Operation principle and hardware description ...
Страница 58: ...58 Electrical installation ...
Страница 74: ...74 Start up control with I O and ID run ...
Страница 106: ...106 Control panels ...
Страница 120: ...120 Application macros ...
Страница 178: ...178 Program features ...
Страница 338: ...338 Fieldbus control with embedded fieldbus ...
Страница 368: ...368 Fault tracing ...
Страница 404: ...404 Dimension drawings ...
Страница 410: ...410 Appendix Resistor braking ...
Страница 434: ...434 Appendix Permanent magnet synchronous motors PMSMs ...
Страница 436: ...3AUA0000066143 Rev D EN EFFECTIVE 2018 01 01 Contact us www abb com drives www abb com drivespartners ...