Installation checklist
43
Installation checklist
Checklist
Check the mechanical and electrical installation of the drive before start-up. Go
through the checklist below together with another person. Read chapter
the first pages of this manual before you work on the drive.
Check
MECHANICAL INSTALLATION
The ambient operating conditions are allowed. (See
Mechanical installation: Requirements
on page
and
on page
The drive is fixed properly on an even vertical non-flammable wall. (See
)
The cooling air will flow freely. (See
page
The motor and the driven equipment are ready for start. (See
Planning electrical installation
on page
and
on page
ELECTRICAL INSTALLATION
Planning electrical installation
and
)
For ungrounded and corner grounded systems: The internal EMC filter is disconnected
(EMC screw removed).
The capacitors are reformed if the drive has been stored over two years.
The drive is grounded properly.
The input power voltage matches the drive nominal input voltage.
The input power connections at U1, V1 and W1 are OK and tightened with the correct torque.
Appropriate input power fuses and disconnector are installed.
The motor connections at U2, V2 and W2 are OK and tightened with the correct torque.
The motor cable is routed away from other cables.
The external control (I/O) connections are OK.
The input power voltage cannot be applied to the output of the drive (with a bypass
connection).
Terminal cover and, for NEMA 1, hood and connection box, are in place.
Содержание ACS350 Series
Страница 1: ...ACS350 User s Manual ACS350 Drives 0 37 22 kW 0 5 30 HP ...
Страница 4: ......
Страница 8: ...Safety 8 ...
Страница 18: ...Table of contents 18 ...
Страница 24: ...Hardware description 24 ...
Страница 44: ...Installation checklist 44 ...
Страница 56: ...Start up control with I O and ID Run 56 ...
Страница 140: ...Program features 140 ...
Страница 242: ...Actual signals and parameters 242 ...
Страница 266: ...Fieldbus control with embedded fieldbus 266 ...
Страница 284: ...Fault tracing 284 ...
Страница 288: ...Maintenance and hardware diagnostics 288 ...
Страница 309: ...Dimensions 309 Frame size R2 IP20 NEMA 1 3AFE68586658 A Frame size R2 IP20 NEMA 1 VAR EMC ...
Страница 311: ...Dimensions 311 Frame size R3 IP20 NEMA 1 3AFE68579872 B Frame size R3 IP20 NEMA 1 VAR EMC ...
Страница 312: ...Dimensions 312 Frame size R4 IP20 cabinet installation UL open Frame size R4 cabinet installation UL open 3AFE68935644 ...
Страница 313: ......