CHAPTER 8 – OPERATION
126
8.5.3 Stop sequence of the drive
Not ready on
Ready run
Ready on
Ready ref
Off command
MCB opens
Operation
AFE Ready on
Stop command
Speed ramps down
INU stops to modulate
Stop command to AFE
Actions:
■
Auxiliary supply is off
■
AFE - INU door
released for opening
■
Drive is grounded
Stopping
DC link discharges
Fan switches off
after a delay
Содержание ACS2000 AFE 1MVA
Страница 6: ...170 Replacing filter mats 171 Phase modules location 171 Phase module Dimensions and weight ...
Страница 8: ...Terms trademarks related documentation ...
Страница 13: ...13 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 14: ...General information on manual and drive ...
Страница 19: ...19 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 20: ...Important note on main circuit breaker ...
Страница 48: ...Chapter 3 Control system 49 Overview 50 Main components 54 I O interfaces ...
Страница 67: ...67 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 77: ...77 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 83: ...83 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J 5 1 3 2 1 4 A B C E D ...
Страница 85: ...85 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 113: ...113 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 114: ...Commissioning check list ...
Страница 149: ...149 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 176: ......