Preparing cables for cable entries with sealing
modules
1. Unscrew the frame and remove the sealing
modules.
2.
Prepare the cables with an outer cable screen
for EMC bonding with the metal enclosure of
the cabinet
as illustrated.
Preparing cables for cable entries with cable
glands
•
Prepare the cables with an outer cable screen
for EMC bonding with the metal enclosure of
the cabinet
as illustrated
.
!
For information on
removing and install-
ing the sealing modules, see
Appendix A –
Additonal manuals.
—
References
—
6-11 Preparing control
cables for sealing
modules
—
6-12 Preparing control
cables for cable glands
—
Sealing module
Conductive foil
Cable sheath removed to expose cable shield
Conductor screen extension to be connected to PE terminal
1
2
3
4
1
2
3
4
—
6-12
Outer cable sheath
Cable gland
Conductor insulation removed to expose cable shield
Plate
Conductor screen extension to be connected to PE terminal
1
2
3
4
5
1
2
3
4
5
Содержание ACS2000 AFE 1MVA
Страница 6: ...170 Replacing filter mats 171 Phase modules location 171 Phase module Dimensions and weight ...
Страница 8: ...Terms trademarks related documentation ...
Страница 13: ...13 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 14: ...General information on manual and drive ...
Страница 19: ...19 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 20: ...Important note on main circuit breaker ...
Страница 48: ...Chapter 3 Control system 49 Overview 50 Main components 54 I O interfaces ...
Страница 67: ...67 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 77: ...77 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 83: ...83 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J 5 1 3 2 1 4 A B C E D ...
Страница 85: ...85 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 113: ...113 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 114: ...Commissioning check list ...
Страница 149: ...149 ACS2000 AFE 1MVA UM 3BHS297030 ZAB E01 REV J ...
Страница 176: ......