Control chain diagrams 415
External PID setpoint and feedback source selection
71
.26
S
e
tp
oin
t min
71
.27
S
e
tp
oin
t max
71
.11
F
eed
ba
ck
filt
er t
ime
Va
lu
e
71
.16
S
etp
oin
t 1
so
ur
ce
71
.21
In
ter
nal
se
tpo
int
1
71
.22
In
ter
nal
se
tpo
int
2
71
.23
In
ter
nal
se
tpo
int
3
Selection
>
Va
lu
e
Va
lu
e
Va
lu
e
71
.0
8
F
eed
ba
ck 1
so
ur
ce
Selection
>
71
.02
F
eed
ba
ck
act
va
lue
Va
lu
e
Va
lu
e
71
.03
S
e
tp
oin
t ac
t v
a
lu
e
Va
lu
e
Va
lu
e
Va
lu
e
Va
lu
e
71
.62
P
ID int
ern
al set
poi
nt ac
tua
l
Va
lu
e
71
.19
In
ter
nal
se
tpo
int
se
l1
71
.20
In
ter
nal
se
tpo
int
se
l2
BIN
TO
INT
SE
L
b0
b1
0
Selection
>
Selection
>
OUT
0
1
2
3
0
Содержание ACQ580
Страница 1: ...ABB drives for water Firmware manual ACQ580 pump control program ...
Страница 4: ... 2017 ABB Oy All Rights Reserved 3AXD50000035867 Rev C EN EFFECTIVE 2017 06 21 ...
Страница 29: ...Start up control with I O and ID run 25 After the ID run is completed text Done is shown on row ID run ...
Страница 30: ...26 Start up control with I O and ID run ...
Страница 40: ...36 Default configuration ...
Страница 304: ...300 Parameters ...
Страница 340: ...336 Additional parameter data ...
Страница 422: ...Contact us www abb com drives www abb com drivespartners 3AXD50000035867 Rev C EN 2017 06 21 3AXD50000035867C ...