EN – US quick installation guide 15
DE
US
DE
ES
FI
FR
IT
NL
PL
PT
RU
SV
TR
ZH
G – Connect the control cables
Procedure:
1. Remove the front cover(s) if not already removed.
2. Frame R3: Lift the control panel holder up. See figure
.
3. Remove the rubber grommets from the bottom plate for the cable conduits to be
installed.
4. Attach the cable conduits to the bottom plate holes.
5. Strip the cable ends and cut to suitable length (note the extra length of the
grounding conductors).
6. Route the cables. Frame R3: See figure
.
Frame R6: See figure
on page
. Frame R8: See figure
on page
7. Secure the cables inside the drive with cable ties.
8. Ground the pair-cable shields and grounding wire at the grounding terminal (SCR)
of the control unit.
9. Connect the conductors to the appropriate terminals of the control unit. See
on page
10. Wire the optional modules if included in the delivery. See the option module user's
manual or installation guide.
Note:
• Leave the other ends of the control cable shields unconnected.
• Keep any signal wire pairs twisted as close to the terminals as possible.
H – Reinstall cover(s)
See figures
.
Содержание ACH580-31
Страница 1: ... ABB DRIVES FOR HVAC ACH580 31 drives Quick installation guide EN US ...
Страница 10: ...10 EN Quick installation guide EN DA DE ES FI FR FR NL PL PT RU SV TR ZH ...
Страница 24: ...24 ...
Страница 30: ...30 ...