![ABB A155-M57 Скачать руководство пользователя страница 175](http://html.mh-extra.com/html/abb/a155-m57/a155-m57_operation-manual_810175.webp)
Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
12 Removing and installing 6-nozzle turbine cleaning component (op-
tional) / 12.1 Disassembly
© Copyright 2020 ABB. All rights reserved.
HZTL4032_EN
Rev.P
March 2020
Fig. 114: Disassembly of the connecting pieces
1. Unscrew hexagon-head screws (51314) from connecting pieces (51313).
2. Remove gaskets (51302).
3. Remove connecting pieces.
4. Remove gaskets from holes.
Fig. 115: Disassembly of the cleaning nozzle
u
Remove cleaning nozzles (51301) with screw (01) in accordance with the following table.
Product
Thread
Length [mm]
Quantity
A150-M
M8
40
1
A155-M
M10
50
1
Table 70: Dismantling screw
Page
145
/
171