![ABB A155-M57 Скачать руководство пользователя страница 129](http://html.mh-extra.com/html/abb/a155-m57/a155-m57_operation-manual_810129.webp)
Operation Manual / 4 Product description / A150-M56/66/57/67 -
A155-M..
9 Dismantling and fitting with removed air inlet and gas outlet / 9.12
Installing the cartridge group
© Copyright 2020 ABB. All rights reserved.
HZTL4032_EN
Rev.P
March 2020
Fig. 63: Installing the cartridge group
Product
Size
Tightening torque [Nm]
A150
M16
175
A155
M16
175
Table 46: Tightening torque (51007)
8. Coat the threads of the studs (51006) with high-temperature grease.
9. Align casing position of cartridge group with marking and lower into the turbine casing.
10. Remove lifting gear cross-piece of service support.
11. Install the fastening strips (51002) with Verbus Ripp® washers (51003) and hexagon
nuts (51007). Observe the tightening torque.
Page
99
/
171