The following scope of supply applies to a 115 kV Bus coupler and Busbar cubicle for
xxx substation:
1 Control terminal, REx 5xx
1 Bus differential relay, using auxiliary sum-
mation CT’s, REB 101, max. 12 lines
1 Back-up panel
3, 4 or 5 RXMS 1 Tripping relays
1 RXMVB 2 Lock-out relay
3, 4 or 5 SPER 1C1 Trip circuit supervision
2 sets of Micro Circuit Breakers
3, 4 or 5 sets of auxiliary CT’s mounted in the
rear
1
5
9
13
17
21
25
29
33
37
41
43
HINGED FRAME, MP=U
MODULE
POSITION
(S=44,5mm)
700
Tripping relays
Trip circuit superv.
MCB
ABB
S
(
&
REx 5xx
Control
M
1
;
en04000350.vsd
REB 101
Bus diff. relay
for Main bus
Содержание 500 Series
Страница 6: ... RQWHQWV ...
Страница 32: ...26 Mounting methods and mounting details KDSWHU 7HUPLQDO GLPHQVLRQV DQG PRXQWLQJ DOWHUQDWLYHV ...
Страница 46: ...40 Test switch modules for RED 521 KDSWHU 7HUPLQDOV ZLWK D WHVW VZLWFK PRGXOH ...
Страница 72: ...66 Making the electrical connections KDSWHU OHFWULFDO FRQQHFWLRQV ...