42/54
TLE Scalable Series 40 to 150 UL S1
UPS Installation Guide / REV-B
4.9.3
Control bus cable location
Warning!
This installation must be performed and verified by an ABB Service Technician before the initial
start-up.
Ensure that the ups installation is completely powered down.
Keep SELV cables separated from high voltage cables.
Fig. 4.9.3-1 View electronic module on intermediate unit
Access to the control bus connection
The communication bus cable connectors are placed on
the two boards “
P13/P14 – IM0
2
22 – Bus Interface
Board
” (see Fig. 4.9.3-1).
Fig. 4.9.3-2 View electronic module on intermediate unit
Control bus cables connection
•
Plug the cables
J1A – J2A
(1/2/3/4/5)
and
J1B – J2B
(1/2/3/4/5) on the
connectors
J1A – J2A
and
J1B –
J2B
placed on the two boards “
P13/
P14
–
IM0
2
22
–
Bus Interface Board
”.
•
Fix the communication bus cables
J1A – J2A
(1/2/3/4/5) and
J1B –
J2B
(1/2/3/4/5) with the provided
cable clamps.
TLES
_UL
_04
0-15
0_S
1_R
PA c
onn
ecti
on_
ABB
_01
E
PO
E
PO
-
+
XA
Q1
I ON
0
O
FF
POWER MODU
LE 1
POWER MODU
LE 2
POWER MODULE 3
RPA
TLES_UL_04
0-150_S1_RPA con
nection_ABB_02
J1 J2
B
J1 J2
A
J1A/1
J1A/2÷5
J1B/1
J1B/2÷5