MODE D’EMPLOI
WE DO IT FIRST.
6.0.0
TECHNICAL DATA
6.1.0
POWER UNIT
System connection
For 3 x 400 V~ 50 Hz with L1-L2-L3-N-PE; Housing only
for standardised service connection with fusing and
residual-current circuit-breaker. The main switch must
have a minimum contact gap of 3 mm.
Control voltage
Extra-low voltage 5 V= and 12 V=
System cable
Typically 5 x 2.5 mm²
Light connection
For 2- (3-) pole connection of the 230 V incandescent
lamp(s); max. 100 W
Heater connection
3 x 400 V~ 5-pole, up to max. 3 kW depending on the
heater output, and/or 14 A per phase
Thermal release
Integrated into the heater sensor as overtemperature
protection; release temperature 139 °C
Temperature sensor
2-pole; semi-conductor sensor -9 ° to 140 °C
Power input
Heater:
max. 3 x 3 kW (heater)
Light:
max. 100 W
Ambient conditions
0 °C to max. 50 °C, max. 95 % rel. humidity, not
condensating!
Housing
IP54; CAT2
Fixing
Screwing-on by means of 4 M3 fixing holes
Dimensions: L x W x H
250 x 165 x 55 mm
Weight
950 g
26/42
INSTRUCTION MANUAL
Содержание Wave 1
Страница 2: ...BEDIENUNGSANLEITUNG WE DO IT FIRST ...
Страница 12: ...BEDIENUNGSANLEITUNG WE DO IT FIRST 10 42 ...
Страница 16: ...BEDIENUNGSANLEITUNG WE DO IT FIRST ...
Страница 17: ...BEDIENUNGSANLEITUNG WE DO IT FIRST WAVE 1 SAUNA CONTROL UNIT INSTRUCTION MANUAL ENGLISH ...
Страница 27: ...MODE D EMPLOI WE DO IT FIRST 25 42 INSTRUCTION MANUAL ...
Страница 31: ...MODE D EMPLOI WE DO IT FIRST WAVE 1 SYSTEME DE COMMANDE DE SAUNA MODE D EMPLOI FRANCAISE ...
Страница 41: ...MODE D EMPLOI WE DO IT FIRST 39 42 ...
Страница 45: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...
Страница 46: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...
Страница 47: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...
Страница 48: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...
Страница 49: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...
Страница 50: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...
Страница 51: ...WE DO IT FIRST NOTIZEN NOTES NOTATIONS ...