Important instructions 

IT-DR

OMEGA

Please, read and understand the manual prior to any 
installation

.

Please follow the instructions, especially those relating to the 
following:

the auxiliary securation of burner,

the proper installation of turbulators, 

the removing of the film from the reflectors,

the proper sealing of tubes,

the proper setting of burners,

the using of original spare parts (alu flex tube cannot be used),

the prohibition on the drilling of expanded pieces,

the using of only water as lubricant when the expansion pieces are 
joined,

the prohibition on sealing the combustion air openings of the LAS 
system,

The picture documentation of exhaust gas measurement and installation can be 
found at the end of the manual.

After installing the heater, please, send us the completed 
installation record. Please, note that failure to send us this 
record leads to voidance of the warranty.

1

Содержание IT-DR OMEGA

Страница 1: ...of burners the using of original spare parts alu flex tube cannot be used the prohibition on the drilling of expanded pieces the using of only water as lubricant when the expansion pieces are joined the prohibition on sealing the combustion air openings of the LAS system The picture documentation of exhaust gas measurement and installation can be found at the end of the manual After installing the...

Страница 2: ...rd last page then send us the completed Installation record Warranty claims can only be enforced if the Installation record was sent to us If you have any questions in connection with installation please call our hotline 0171 4342979 abacus AG Margaritenstraße 16 91074 Herzogenaurach Tel 09132 7416 0 Fax 09132 7416 29 E mail abacus ag t online de 2 ...

Страница 3: ...e process until the proper shame and length is achieved Next secure joints with self drilling and taping screws three per joint placing the screws at 120 3 The turbulator should always be placed in the last tube the one before the exhaust system Please note that for some constructions more than one turbulator is to be installed The turbulators provided have to be riveted to each other and slided i...

Страница 4: ... changes differently secure no more than two reflectors together Secure the burner side reflector shields using the self drilling and taping screws provided Reflector assembling 1 Starting point of reflector assembling 2 Place the reflectors onto each other so that the tabs of the reflectors cover each other 4 ...

Страница 5: ...ted prevents that reflectors slide off of each other and stick together during contraction which would reduce their available space and could lead to the damage of the reflectors Always make sure that reflectors can easily move in their supports If required the outer edges of the reflectors can be pushed carefully about 15 cm before and after the support VERY IMPORTANT Before installation remove t...

Страница 6: ...ping screws Whichever method is used always secure the burner with at least two other self drilling and taping screws to the burner tube 7 Connect the combination hangers to the chains using carabiners NOTE It is practical to assemble the appliance on the floor and then lift the assembled unit into place using a lifting machine If this is impossible the heater can also be suspended in several part...

Страница 7: ...L 3 m design full length two combination hangers are enough in the distance of 1800 mm Secure the first hanger 700 mm from the front of the burner tube 2 2 Assembly distances of U configuration example OMEGA 9U 7 ...

Страница 8: ...n depending on output 0 5 m above the reflector 0 8 m sideways 1 5 m downward 1 m lenghtwise Minimum angle of elevation of burner tube and radiant tubes Maximum tilt angle of heater 3 1 SUSPENSION After defining the location of hangers the appliance should be suspended using hangers e g chains with a minimum length of 400 mm This is required because of longitudinal deformation due to thermal expan...

Страница 9: ...e regulator to prevent clogging which might be caused by the deposits that can occur in the pipes even if they are blown out The connection to the gas pipeline should be made from above or from the side as connecting from below enables the accumulation of contamination The thermal expansion of the tube radiant heater has to be taken into consideration when connecting the gas supply therefore a fle...

Страница 10: ...twork with the safety connector on the casing next to the blower Electric cable connection with plug or fixed connection Supply wire 3 x 0 75 mm The appliance is phase sensitive make sure to follow the connection arrangement below Protection 2 A electric fuse Before replacing a fuse the appliance should be disconnected from the electric network The OMEGA tube radiant heater can be operated in auto...

Страница 11: ...0 150 Indirect exhaust gas extraction using roof or wall blowers with a minimum capacity of 10m h kW Natural venting air change 1 5 h or less than 5W installed capacity per hall volumem In case of excessive condensation condensate should be conveyed in additional drains or operate the burner for the required time e g modification of hysteresis The exhaust gas extraction of the tube radiant heater ...

Страница 12: ...12 ...

Страница 13: ...PUTTING INTO OPERATION OPERATION 13 ...

Страница 14: ... the appliance the blower starts to rotate After a pre purging period of 30 seconds sparks are produced and the gas valve is opened When the sensing probe detects the presence of the flame spark is de energized it is de energized after 3 5 seconds in all cases and the burner starts to heat the green control light on the bottom part of the appliance is ON If the sensing probe does not detect flame ...

Страница 15: ...lease copy the serial numbers located on the nameplate burner box in the Installation record last page then send us the completed Installation record Warranty claims can only be enforced if the Installation record was sent to us If you have any questions in connection with installation please call our hotline 49 9132 7416 11 15 ...

Страница 16: ... OM 6U DR 54 OM 9U 3 0m 6 0m 9 0m DR 24 OM 3U 8 1 7 2 10 1 9 0 12 1 5 10 8 14 1 5 12 6 16 1 5 14 4 DR 46 OM 6U 18 1 16 2 20 1 18 0 22 1 19 8 24 2 21 6 26 2 23 4 28 3 25 2 30 3 27 0 32 3 28 8 DR 54 OM 9U 34 34 3 30 6 30 6 DR 46 OM 6U DR 54 OM 9U 36 3 32 4 32 4 DR 54 OM 9U 38 2 34 2 40 2 36 0 42 2 37 8 44 2 39 6 46 2 41 4 48 2 43 2 50 2 45 0 Weight kg 50 70 95 16 ...

Страница 17: ... 4 3 2 4 20 8 6 24 9 4 2 4 5 2 5 22 8 6 24 9 4 4 4 7 2 6 24 8 6 24 9 4 6 5 0 2 7 26 8 6 24 9 4 8 5 2 2 8 28 8 6 24 9 5 0 5 4 3 0 30 8 6 24 9 5 3 5 7 3 2 32 8 6 24 9 5 5 5 9 3 4 DR 54 OM 9U 34 34 8 6 24 9 5 7 6 2 3 5 DR 46 OM 6U DR 54 OM 9U 36 8 6 24 9 6 1 6 5 3 6 DR 54 OM 9U 38 8 6 24 9 6 3 6 8 3 6 40 8 6 24 9 6 6 7 1 3 7 42 8 6 24 9 6 8 7 4 3 7 44 8 6 24 9 7 1 7 7 46 8 6 24 9 7 4 8 0 48 8 6 24 9 ...

Страница 18: ...urner tube and radiant tube mounted vertical to the burner box are suspended in a straight line Overlappping of reflector Turbulator retarder position Location and securing of exhaust gas system Tighness of exhaust gas system optical examination Exhaust gas analysation CO value ppm NOXvalue ppm Excess air value Exhaust gas temperature C Nozzle pressure mbar Combustion air quality sound and colour ...

Страница 19: ...Date Distributor Technician A copy of the Installation record has to be sent immediately to the manufacturer to give effect to the warranty 19 ...