18 CR11*, CP11*, CT11* 6U CompactPCI® SBC
Publication No. HRMCR11 Rev. B.0
CHAPTER 3
Chapter Scope
Installat
i
on preparation
Installation
This c
h
apter covers the installation of the CR! I CompactPCI Single Board
Computer in a CompactPCI badq,lane and initial power-on operations
.
Use the following steps to install your
A
baco h
ardware
.
•
Before installing or removing any board, please ensure that
th
e system
power and external supplies have been turned off.
•
Check that the jumpers and mezzanines are correctly confi
gur
ed for your
application
.
•
Mount the boar
d/
mezzanine
/
transition module very carefull
y.
See also
additional advisor
i
e
s
for VMEbus and CompactPCI products below
.
•
Cow1ect all IO cable
s
.
•
Once you are certain that all modules are correctly fitted into the system
and all com1ections have been made properly, restore the power.
General Advisories
Before installing or remo
v
ing any board
,
please ensure that t
h
e system power
and external supplies have been turned off
Check that jumpers and mezzanines are correctly confi
gur
ed for
y
our
application
.
Mount the board
,
mezzanine, or tran
s
i
tion module very carefull
y
.
See also sections on additional advisories below.
Do not restore power w1til you are sure that all modules are fitted correc.tly and
all connec
t
ions have been made properly.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com