background image

22

Apex Multifuel Stoves

INSTALLATION

ADD IN BOILERS

Apex multifuel stoves offer the option of a slab
boiler, which occupies the position of the rear
firebox liner panels.

Fitting:

•Remove the fuel retainers, rear firebox liner panels
and throat plate.

•Knock out the blanking discs in the back plate
corresponding to the terminals on the boiler.

•Introduce the boiler to the appliance through the
main fire door and locate the terminal pipes
through the back plate holes and seal around boiler
terminals with fire cement.

•Engage locking nuts to the thread of the terminals
and tighten to secure the boiler in position, ready
for connection to flow and return pipes.

•Replace throat plate (slab boilers only) and fuel    
retainers.

Do not fit throat plate with cantilever boiler.

Note: On boilers the terminal which is
approximately flush with the edge of the boiler
and marked "TOP" must be fitted uppermost, to
prevent "Kettling".

WATER CONNECTIONS

Heating systems

The size of the heating system which can be run,
will depend on the output rating of the appliance. It
will be necessary to work out heat loss calculations
for the system proposed in order to establish the
kW/hr rating. An appliance that will meet this
figure can then be chosen; (for boiler outputs please
refer to the brochure).

The constructional requirements of installing and
connecting the appliance also need to be taken into
account when selecting. Design and calculations
for individual heating systems should be carried out
by a qualified heating engineer. In many cases your
supplier will be able to offer advice and assistance.

Direct Systems

Stainless steel boilers, either factory fitted or
retro-fitted as add-in boilers enable connection to
direct systems to be made without the need to
change the cylinder or to fit an expansion tank. This
applies to domestic water supply only 

and should

not be done when in an area with soft water.

If

radiators are used then an indirect system must be
utilised.

To connect the cylinder use 28mm copper pipes.
Ensure that the pipes rise continuously to the
cylinder.

Ensure that the runs are not too long, i.e. 20ft
maximum each for flow and return. Install the
cylinder above the level of the fire, and as close to
it as possible. (the higher the cylinder the faster the
circulation). Ensure that no valves are present in the
circulating pipes.

Indirect Systems- The Domestic Hot Water
Circuit

In addition to providing hot water the primary
circuit is essential in providing a "heat leak" to
absorb excessive heat produced in the event of the
circulation pump shutting down.
Heat is produced in varying quantities while the
fire is alight and care must be taken to ensure that
effective circulation can occur around the primary
circuit to carry heat away and thus stop boiling. The
output of any radiator installed as a "heat leak"
should not be less than 10% of the rated output of
the appliance. The radiator should 

not

be fitted

with a control valve.
The cylinder must be of the indirect type with a
minimum capacity of 110 litres, conforming to
BS 1566 part 1.

Содержание Apex

Страница 1: ...The Apex Multifuel Stove Operating Installation Manual PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE Rev 3 2004 Part No AFS1130...

Страница 2: ...which is why we are so confident in the reliability of our product Should you have any questions about our Apex Stoves that are not covered in this manual please contact the Aarrow dealer in your are...

Страница 3: ...emoval 13 Over Firing 13 Cleaning 13 Annual Maintenance 14 INSTALLATION Page General Precautions 15 Handling 15 Hearth 15 Combustible Materials 15 Firebox Liner Panels 16 Throat Plate Inspection 16 Fi...

Страница 4: ...T BE BURNED IN THIS APPLIANCE TO USE THESE FUELS WILL INVALIDATE THE APPLIANCE GUARANTEE www solidfuel co uk IF IN DOUBT CONTACT THE SOLID FUEL ASSOCIATION TELEPHONE NUMBER 0800 600 000 THE USE OF SPA...

Страница 5: ...erly installed and operated a house fire may result Installation must comply with the Building Regulations and conform to all relevant fire safety standards Aarrow Fires produce a variety of appliance...

Страница 6: ...Aid not to scale Apex Multifuel 1 Grate bars 7 2 Fuel retainers 2 3 Throat plate 1 4 Flue spigot 1 5 5 Hot plate 1 5 6 Ash pan 1 7 Operating tool 1 8 Rear liners 2 9 Side liners 2 10 Fire door handle...

Страница 7: ...Heater with Domestic Hot Water with add in boiler type 0 Max Output to Room kW Max Output to Water kW 5 kW 2 kW Height mm 550 Width mm 447 Depth mm 362 Height to Centre of the Rear Flue mm 432 5 Depth...

Страница 8: ...ough the control on the bottom of the fire door The Aarrow Apex has a single control knob which slides left to right Sliding the knob to the right will increase the amount of air intake to the stove T...

Страница 9: ...n a workbench or similar level surface This should be done when the appliance is cold Remove the fire door as follows Support the fire door in a slightly opened position and loosen the four screws hol...

Страница 10: ...remove any pieces of broken glass and sealing gasket wearing suitable gloves Re seat the new gasket and glass ensuring the sealing gasket is flat and in contact with the glass fig 6c Fig 6c Replacing...

Страница 11: ...azebrite Taybrite Sunbrite Doubles Singles Anthracite Large Nuts and Welsh Dry Steam Coal Large Small Nuts Approval does not cover the use of other fuels either alone or mixed with the suitable fuels...

Страница 12: ...the area is well ventilated during this time OVERNIGHT BURNING The appliance will bur overnight provided Sufficient fuel is placed in the firebox The controls are set correctly Excess draught is not...

Страница 13: ...d easily start a fire or cause an injury Replace the ash pan and close ash door Close the fire down CLINKER The formation of clinker suggests that the unit is being over fired Any clinker forming on t...

Страница 14: ...nged shut down period DOOR GLASS The door glass should remain clear during normal daytimeburning Howeverundercertainconditions such as burning at a low rate with damp wood or overnight burning the gla...

Страница 15: ...ARTH The fire should be installed to stand on a constructional hearth of non combustible materials not less than 125mm 5 thick conforming to Building Regulations Dimensions of the hearth should projec...

Страница 16: ...hroat plate grate REMOVAL OF THE THROAT PLATE Blocked chimneys cause dangerous fumes to escape Remove the throat plate at least monthly to clean Keep chimney and flue ways clear FITTING THE OPTIONAL F...

Страница 17: ...ering end marked L onto the low section of the comb The upper bar is fitted in a similar manner but with the end marked L inserted in the rear channel and the end marked H seated on the high section o...

Страница 18: ...is important that the flue gases are kept warm and that the flue size suits the stove The termination of the outlet at the top of the flue also needs to comply with the Building Regulations The minimu...

Страница 19: ...roved Document J of the Building Regulations for England and Wales is available from The Stationery Bookshops and can also be viewed at the ODPM website at www safety odpm gov uk bregs brads htm Detai...

Страница 20: ...20 Apex Multifuel Stoves INSTALLATION...

Страница 21: ...D FLUES TYPICAL METAL INSULATED CHIMNEY SYSTEM TO BE INSTALLED TO THE CHIMNEY MANUFACTURERS INSTRUCTIONS IN COMPLIANCE WITH BUILDING REGULATIONS AND BS7566 PTS 1 4 A is minimum clearance for non insul...

Страница 22: ...ns for individual heating systems should be carried out by a qualified heating engineer In many cases your supplier will be able to offer advice and assistance Direct Systems Stainless steel boilers e...

Страница 23: ...rom the expansion tank should be 28mm diameter copper Pipes in unheated spaces must be lagged FINAL CHECK Before handing over the installation to the customer it is strongly recommended that the appli...

Страница 24: ...liances only c If clay or concrete flue liners used confirm that they are correctly jointed with socket end uppermost and state jointing materials used d If an existing chimney has been refurbished wi...

Страница 25: ...Apex Multifuel Stoves 25 NOTES...

Страница 26: ...26 Apex Multifuel Stoves NOTES...

Страница 27: ...es 27 PARTS LIST 1 Fuel Retainers AFS1012 AFS1102 AFS001 AFS009 AFS008 AFS1103 AFS010 2 Throat Plate 3 Grate Bar 4 Hot Plate 5 Operating Tool 6 Ashpan 7 Flue Spigot Part Description Visual Aid not to...

Страница 28: ...AFS1106 AFS1108 AFS1110 AFS1111 AFS1115 AFS1077 9 Side Liner 10 Back Liner Set 11 Glass Replacement Kit Complete with Gasket 12 Glass Clips 13 Hinge kit Comprises 2 Hinges 8 Fixings Per Set 14 Airwas...

Страница 29: ...FS1114 AFS204 AFS997 16 Main Door Assembly Complete with Handle Glass Gaskets Clips and Seal 17 Comb with Extension 18 Fire Door Locking Assembly 20 Aarrow Fires Gauntlet Gloves Part Description Visua...

Страница 30: ...gineer The Manufacturers decision shall be final If your appliance proves to be defective as a result of faulty materials or workmanship during guarantee we will repair or replace it FREE OF CHARGE as...

Страница 31: ...s manual please contact your Aarrow retailer Please keep all repair receipts safely Please ensure you have this manual available when an engineer visits as they will complete the service record chart...

Страница 32: ...ecked it and it s O K Assembled by Checked by Date of Purchase Name and address of supplier Please ensure installer completes INSTALLATION CHECK LIST details on page 24 of this manual If an add in boi...

Отзывы: