2.4
.
Operating conditions
Generally, this parking li� must be installed and operated under the following condi�ons:
-Voltage supply: 0.9 – 1.1 �mes of nominal supply voltage as s�pulated on sales contract, proforma invoice, or
purchase order.
-Frequency: 0.99 – 1.01 �mes of nominal frequency
-Ambient temperature: -15
℃
to +40
℃
-Rela�ve humidity: not exceed 50% at 40
℃
-Atmosphere: Free from excessive dust, acid fume, corrosive gases and salt.
-Avoid exposing to direct sunlight or heat rays which can change the environmental temperature.
-Avoid exposing to abnormal vibra�on.
-Electrical parts shall withstand the effects of transporta�on and storage temperature within a range of -15
℃
to
55
℃
and for short periods not exceed 24 hours at up to +70
℃
.
3.1
Select location
3.1.1
Before installa�on, consult the architectural plans for the desired loca�on for installa�on, make sure that
the space can be well occupied for your
hoist
.
3.1.2
Make sure that the site space is enough to cater your
hoist
, either
AL-2525
or
AL-
2625. Detailed sizes refer
to 2.3. Dimensions.
3.1.3
This parking
hoist
is designed for indoor usage only, enough headroom (overhead clearance) must be
considered in the en�re cover area. Please mind the obstruc�ons such as HVAC materials, hanging lights, electrical
lines, etc., which could cause damage to the vehicles on top.
3.1.4
Side clearances at le� and right shall be reserved to at least 50mm (2 inches).
3.1.5
Safe clearances in rear side to the wall behind (if available) shall be at least 200mm (8 inches).
3.1.6
Power source shall be easily accessed to the Powder Pack of your
hoist
(s).
3.1.7
For outdoor or exterior installa�ons, please consult our local partners or
Advance AutoQuip 2000
sales
team to verify the possibility or purchase outdoor op�ons/add-ons that’re necessary to do so.
3.2
Foundation treatment
3.2.1
When installing the parking li� on exis�ng floor
- The floor must be flat and concrete, allowed degree of slope is 1%
- Minimum thickness is 300mm, concrete grade C30 or above.
- If your concrete floor slope is <1%, please use shims to level the li�.
- If your concrete floor slope is >1%, consider making the floor level or using a different loca�on.
- If floor thickness is <300mm, please consult your architect or structural engineer to calculate the loading force
to the floor, ensuring that the floor is strong enough to hold the force. Weight of each
AL-2525
is approx. 2000kg.
3.2.2
When making a new floor for your
hoist
:
- Minimum concrete thickness is 200mm, concrete grade C30 or above;
- Concrete beneath columns shall be treated separately, thickness at least 300mm, area 500x500mm.
- Pour concrete over rammed earth as shown in below figure, allowed tolerance for evenness is <10mm
3
Site planning
04
AL
2525 &
AL
2625
USER MANUAL