8
STEP 2
: (Unloading and Unpacking)
1.
After unloading the
hoist
, place it near
the
intended installation location. (Fig. 3)
2.
Check the items with packing list.
3.
Remove the shipping bands and packing
materials from the unit.
4.
Remove the packing brackets and bolts
holding the two runways together. (
Do not
discard bolts, they may be used in the
assembly of the
hoist
)
STEP 3
: (Site Layout)
1.
Determine which side will be the approach side.
2.
The power-side runway is always on the left side of the approach side. The POWERSIDE column
has the power-unit mounting position on the side. Note the power unit column can only be located
on the far end of the left side.
3.
Once a location is determined, use a carpenter’s chalk line to layout a grid for the post locations.
Keep all dimensions and square within
20mm
otherwise malfunction of the
hoist
will occur. ( Fig.
40 on
page 20)
4.
After the column locations are properly marked, use a chalk or crayon to make an outline of the
posts on the floor at each location using the post base plates as a template.
5.
Double check all dimensions and make sure that the layout is perfectly square.
6.
Before continuing with the installation it is helpful to stand the posts up at their respective
locations and get a visual of the shop, aisles and other clearances. Also, this is a good time to
drive a vehicle into position and check for adequate clearance.
STEP 4
: (Installing the Columns with cross bars)
1.
Before proceeding, double check measurements and make certain that the bases of each column
are square and aligned with the chalk line.
2.
Locate the columns at their respective locations according to the chalk line layout. Pay attention
to the power-side column (It is with the holes for pump mounting Fig.4). DO NOT BOLT columns
at this moment. Use caution to prevent columns from falling over.
3.
Insert the end of cross bar into every column. (Fig. 5)
4.
Insert the safety rack into the cross bar end as shown (Fig. 6 & 7).
NOTE
All models MUST be installed on 3000PSI concrete only confirming to the minimum requirements.
New concrete must be adequately cured by at least 28 days minimum.
Fig. 3 Packing