PREPARATION
The installation of this
hoist
is relatively simple and can be accomplished by one man in a few
hours. The following tools and equipment are needed:
AW 32
or
46 Non-Detergent Non-Foaming Anti-Wear Hydraulic Oil
32 Grade
(12
litres
) Chalk line and 12’ Tape Measure, Transit and a 4’ Level
Rotary Hammer Drill with 7/8” Masonry Drill Bit. Core Drill ReBar Cutter recommended
Hammer and Hex-Key / Allen Wrench Set
Sockets and Open Wrench set, 1/2” thru 1-1/2”(1-1/8” for 3/4” Anchors)
Medium Crescent Wrench and Medium Pipe Wrench
Crow Bar for Shim Installation and Medium Flat Screwdriver
Vise Grips and Needle Nose Pliers
GENERAL INFORMATION
1.
Carefully remove the crating and packing materials. CAUTION! Be careful when
cutting steel banding material as items may become loose and fall causing personal
harm or injury.
2.
Identify the components and check for damage or shortages. If damage or shortages
are discovered, contact distributor immediately.
Save the shipping bolts for use in the
installation
.
Packing
:
*The
hoist
packed into two columns in one rack.
*Every column with its cylinder, carriage, lifting arms, pad with holders, oil pipes, and
cart. Accessory box is in one column.
*There is the hydraulic motor pump in one carton separately.
3.
The power supply for the motor pump of this
hoist
is 240V/50Hz, single phase, 15A.
Содержание 167212E
Страница 6: ...167212E Nov 2016 6 Fig 3 ...
Страница 17: ...167212E Nov 2016 17 PARTS CODE AND DRAWING Fig 24 column carriage lifting arm cylinder ...
Страница 21: ...167212E Nov 2016 21 PARTS CODE AND DRAWING Fig 25 control box detail ...
Страница 23: ...167212E Nov 2016 23 PARTS CODE AND DRAWING Fig 26 motor pump detail ...