5
ArrestAll
© 2015 American Air Filter Company, Inc. Any use of the text or images
this document contains, without permission of American Air Filter
Company, Inc., is prohibited. ArrestAll, AAF, REDClean, REDFiltration,
and Reliable Efficient Durable are registered trademarks of American Air
Filter Company, Inc. d/b/a AAF International.
1
INTRODUCTION
This document contains the information necessary to properly receive,
assemble, install, operate, and maintain
the AAF
®
ArrestAll
®
filter system and
filters. The purchaser, installer, and operator of the filter system MUST read and
comply with this document in its entirety prior to installation of the equipment and
its operation. Failure to comply with the requirements of this manual may void the
product warranty. The information and guidelines contained in this manual are not
exhaustive, and additional or different precautions, measures, training, etc. may
be needed depending on the specific circumstances.
CAUTION
These instructions are specific to the AAF ArrestAll filter system and filters.
All ancillary tasks including, but not limited to, electrical and mechanical
work, equipment handling, and safety procedures must be performed in
accordance with industry accepted practice and all relevant local, state, and
federal government codes, laws, and policies.
2
SAFETY
2.1
Safety statement
The air cleaning equipment supplied by AAF International ranges from very
large multiple-component assemblies which require significant and complex,
rigging, handling and assembly on-site, to small compact assemblies that are
easily handled and maneuvered. In addition to size, many of the dust collectors
will require electrical connections, compressed air connections, and will feature
high speed rotating equipment.
At all times, when dealing with industrial equipment such as dust collection
equipment personnel safety must be the highest priority of all involved, from
riggers, installers, operators, users, and maintenance personnel. Those
responsible on-site shall review the details of the equipment beforehand and
develop a plan for dealing with all stages of the installation from receipt of the
equipment on-site to start-up, commissioning, and hand-over. All applicable
health, safety, and environmental (“HSE”) rules, regulations and legislation shall
be fully complied with at all times.
2.2
Safe working practices and staff training
AAF International is fully committed to the safety of its employees and those
of its customers. In this spirit the following guidelines are offered for the
consideration of those responsible: