I n d u s t r i a l W o r k s t a t i o n
A M B - 2 4 X X
AMB -24xx series User Manual V1.2
31
CPU Card Installation
Signal transfer between CPU card and front panel via a transfer board. The signal
include Keyboard, mouse, VGA and touchscreen. It will show how to connect
them in the below photo.
TB-908D Transfer Board install (1)
TB-908D Transfer Board install (2)
Содержание AMB-2427 Series
Страница 6: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 6 General Information Chapter 1...
Страница 19: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 19 Hardware Installation Chapter 2...
Страница 23: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 23 10 slots passive back plane...
Страница 25: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 25 3 Install HDD Cable 4 Install FDD Cable...
Страница 26: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 26 5 Install CD ROM Cable 6 Install in Chassis...
Страница 27: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 27 7 Fasten in chassis with two screws...
Страница 30: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 30 3 Install replace fan filter...
Страница 33: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 33 From TB 908D to CPU card 3...
Страница 35: ...Industrial Workstation AMB 24XX AMB 24xx series User Manual V1 2 35 Power Supply Specification Appendix A...