background image

®

Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468

 Toll Free: (800) 523-5471  Phone: (610) 825-6565

www.aaesports.com

Left End 

Post

Inner 

Post

Inner 

Post

Right End 

Post

Cleet:

Orientation
(all posts) 
away from field 
of play

Net Hoist:

Orientation
(all posts) 
towards field of 
play

Lower Collars:

Orientation
(all posts) towards 
field of play 

(refer 

to post assembly 

pages)

Post / Groundsleeve

Installation (fully seated)

Post

will stop

once it rests

on stop bolt 

After posts have 

been lowered 

into place, 

secure the lower 

collar(s) into 

place. 

Post / Groundsleeve

Installation

Installation Notes:

View above is from net side of post (

field 

1.

of play

).

Caution

, slowly lower posts into sleeves.

2.

Dropping post into sleeve may result in

damage to the stop bolt.

Make sure all posts are orientated

3.

correctly. Pulley system towards field of

play and cleet away from field of play. All

lower horizontal cable collars should face

field of play.

Once posts are correctly orientated, make

4.

sure the lower collars are properly

orientated and secure them into place.

View from field of Play

Note:

 Height & number of inner posts 

may vary from what is shown. 

SBS-40

Assembly Instruction

Posts to Groundsleeve

10

 of 1

2

Содержание SBS-40

Страница 1: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com 1 of 12 SBS 40 40 High Soccer BallStopper System Specification ...

Страница 2: ...0 523 5471 Phone 610 825 6565 www aaesports com 20 0 240 MAX 20 0 240 MAX 20 0 240 MAX Refer to Association Guidlines for Placement Distance Post Spacing Distance is not to Exceed Specification Field of Play End Line Left End Post Inner Post Inner Post Right End Post SBS 40 Specifications 6 3 2016 SBS 40 40 HIGH BALLSTOPPER SYSTEM CUSTOMER Concrete Footing Placement Specification DWG NO SBS 40 C 0...

Страница 3: ...re Stainless Steel Pear Clip Stainless Steel DETAIL D Tensioner Kit Galvanized Steel DETAIL B Open Eyebolt Stainless Steel End Posts Only SBS 40 Specifications Post Aluminum 8 x 188 wall aluminum tube Mill Aluminum 6061T6 46 0 Overall Length 41 0 out of ground sleeve Weight 249lbs ea All Hardware is RUSTPROOF Netting Net AAE N367 3 1 2 Sq Knotted Nylon FR DBB length to vary 1 4 MFP Rope Border UV ...

Страница 4: ... 36 Hole Diameter 6 6 78 Sleeve Length 4 6 5 0 60 to Stop Bolt Stabilzed Subgrade Crushed Stone C o n c r e t e C o n c r e t e Aggregate Aggregate Artificial Grass Field Footing Specification Turf Turf Top of post sleeve should be even with aggregate 2 A B C D DRAWN BY CAD FILE MODEL DATE NOTE SBS 40 Specifications 6 3 2016 SBS 40 N R Grass Turf Footing Specification DESCRIPTION 1 2 3 4 5 6 A B C...

Страница 5: ...side Left Right End Post Lower Vertical Cable Tensioner Collar Assembly Cable loop end show for reference only not pre installed Cable loop end show for reference only not pre installed A A A A Note Hardware denoted with A is included in item 12 tensioner kit 11 16 15 14 A Inner Post Lower Horizontal Cable Pear Clip Collar Assembly 14 13 15 16 11 18 19 17 20 21 Left Right End Post Mid Vertical Cab...

Страница 6: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No SBS 40 Parts List 6 of 12 ...

Страница 7: ...end of post Before securing collars into place make sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so that 2 it is on backside of post opposite net Screws will be inserted through cleat and post and secured on net side using flat washers Nylock hex nuts and cap nuts refer to diagram Mid Collar Note orientation of 3 collar on post From top of pole slide...

Страница 8: ...rrect orientation refer to diagram Cleat Is to be installed so that 2 it is on backside of post opposite net Screws will be inserted through cleat and post and secured on net side using flat washers self locking hex nuts and cap nuts refer to diagram Eyebolt Pulley system comes 3 preassembled to eyebolt Install washer onto eyebolt then insert eyebolt with washer through front side of hole at top o...

Страница 9: ...ould be 60 from end of post Before securing collars into place make sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so 2 that it is on backside of post opposite net Screws will be inserted through cleat and post and secured on net side using flat washers self locking hex nuts and cap nuts refer to diagram Mid Collar Note orientation 3 of collar on post ...

Страница 10: ...nto place secure the lower collar s into place Post Groundsleeve Installation Installation Notes View above is from net side of post field 1 of play Caution slowly lower posts into sleeves 2 Dropping post into sleeve may result in damage to the stop bolt Make sure all posts are orientated 3 correctly Pulley system towards field of play and cleet away from field of play All lower horizontal cable c...

Страница 11: ...detail on collar and cable assembly Install Crimped Cable End to Right End 2 Post collar using an anchor shackle Route cable to Left End Post Snap cable 3 into Pear Clips of the Inner Posts along the way Before assembling Clamped Cable Loop 4 End fully open the turnbuckle With anchor shackle and thimble inplace 5 run cable thru the shackle as shown Pull slack out of cable and mark vinyl sleeve app...

Страница 12: ... of posts Using a Pear Clip Secure upper net 2 corners to End Post Vertical Support Cables as shown in Detail C Secure Brass Rings to top of net using 3 Cable Clamp as shown in Detail A One ring and clamp per post and they should be centered as close as possible to its coinciding post After Brass Rings have been secured to 4 net clip ring into it s posts hoist system Pear Clip as shown in Detail B...

Отзывы: