background image

®

Aluminum Athletic Equipment

1000 Enterprise Drive, Royersford, PA 19468

 Toll Free: (800) 523-5471  Phone: (610) 825-6565

www.aaesports.com

Note:  Hardware denoted 

"B" is included in item 

#3 "Hoist Rope"

B

22

Brass Ring

Detail A

B

Cable

Clamp

Top of net is 

bound to a 

steel cable

Hoist System

Detail B

B

Pear Clip

(pre-installed)

Net to End Post 

Vertical Support Cable

Detail C

23

Upper Horizontal & Corner

Vertical Support Cables

Detail D

(Left Corner Post config shown)

Upper Horizontal Cable

(in front of net & corner 

vertical cables)

 

Corner Post

Vertical Cable

Net to Lower

 Horizontal Support Cable

Detail E

Cable Ties

(6" spacing)

Installation Notes:

Lay net on ground across span of posts. 

Make sure net 

1.

is centered accross span of posts.

Using a Pear Clip Secure upper net corners to End Post 

2.

Vertical Support Cables 

(as shown in Detail C)

Secure Brass Rings to top of net using Cable Clamp 

(as 

3.

shown in Detail A)

. One ring and clamp per post and 

they should be centered as close as possible to its 

coinciding post.
After Brass Rings have been secured to net, clip ring 

4.

into it's posts hoist system Pear Clip 

(as shown in 

Detail B)

.

As net is being raised make sure to secure net sides to 

5.

the end post vertical support cables using provided 

Pear 

Clips

 

(refer to Detail C)

.  Pear Clips should be spaced 

approx. 12" or 9 net squares.
Once net has been completed raised tie hoist ropes onto 

6.

cleat. Connect and tension the clamped loop ends of the 

Corner Post Vertical Cables

.

Next install the

 Upper Horizontal Cable

Process for 

7.

installation is the same as the Lower Horizontal cable.  

Difference being to make sure to run cable so that the 

net and corner post vertical support cables are between 

it and the posts

(refer to Detail D)

.

Lastly using provided 

Cable Ties

 spaced 6" apart, 

8.

secure net offset border to fence rail

(refer to Detail E)

.

Note: Collars are Black in color, 

shown in different colors to aid in 

identification.

Pear Clips

Spaced approx. 

every 12", entire 

length of vertical 

cable (

Left and 

Right End Posts 

Only

)

BBS-25

Assembly Instruction

Net Attachment

24 of 25

Содержание BBS-25

Страница 1: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com 1 of 25 BBS 25 25 High Baseball BackStopper System Specification ...

Страница 2: ...lines for Placement Distance Total Length of 3rd Base Run Specified by Customer 20 240 Max Distance Between Uprights Total Number of Uprights Total Length of 1st Base Run Specified by Customer 20 240 Max Distance Between Uprights Total Number of Uprights Notes Total number of Uprights per run 1 is determined by dividing the runs length evenly with the resulting sections not exceeding 20 on center ...

Страница 3: ...e Collar Black Vinly Coated Galvanized Steel Net with Integrated Clear Vinly Coated Galvanized Steel Cable Heavy Duty Braided Nylon Rope Black Cable Clamp Galvanized Steel Pear Clip Stainless Steel O Ring Brass Eyebolt Stainless Steel Hanging Pulley Galvanized Steel Vertical Cable Vinyl Coated Galvanized Steel BBS 25 Specifications Net AAE N361 36 1 3 4 sq knotted Nylon DBB length to vary 1 4 MFP ...

Страница 4: ...ngth 3 6 42 to Stop Bolt Crushed Stone C o n c r e t e C o n c r e t e No Drainage Taper Custom Sleeve Footing Post In Wall Specification Notes If system is an in wall installation than 1 height of wall is deducted from net height to ensure proper tension is attained on net when raised i e 20 High system with 3 High backstop wall would have a net height of 17 A B C D DRAWN BY CAD FILE MODEL DATE N...

Страница 5: ...able Pear Clip Collar Assembly 31 30 32 34 33 Apply Supplied Anti Seize to bolt threads 30 36 35 34 33 Vertical Cable Open Eyebolt Collar Assembly Apply Supplied Anti Seize to bolt threads Horizontal Cable Shackle Collar Assembly 31 33 34 30 37 Apply Supplied Anti Seize to bolt threads 31 30 33 34 Apply Supplied Anti Seize to bolt threads Note Collars are Black in color shown in different colors t...

Страница 6: ...ement at each end and in corners if run is not straight i e backstop Cable Tie 6 Spacing Net Offset Rope Border Attachment Cable Small Eyebolt used to hold down cable 4 Spacing Attachment Cable Cable Tie 6 Spacing Net Offset Rope Border Note Pre Fab Approval form will need to be filled out prior to making the system where wall fence heights length of net and attachment style will need to be specif...

Страница 7: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No BBS 25 FA Parts List 7 of 25 ...

Страница 8: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No BBS 25 WA Parts List 8 of 25 ...

Страница 9: ... Aluminum Athletic Equipment 1000 Enterprise Drive Royersford PA 19468 Toll Free 800 523 5471 Phone 610 825 6565 www aaesports com Model No BBS 25 SA Parts List 9 of 25 ...

Страница 10: ... sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so that it is on 2 backside of post opposite net Screws will be inserted through post and cleat and secured on opposite of net side using Nylock hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation 3 of collar on post From top of pole slide the open eyebolt collar into position ...

Страница 11: ... place make sure to rotate the lower vertical collar approx 40 refer to diagram Cleat Is to be installed so that it is on 2 backside of post opposite net Screws will be inserted through post and cleat and secured on net side using Nylock hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation 3 of collar on post From top of pole slide the open eyebolt collar into position r...

Страница 12: ...ntation refer to diagram Cleat Is to be installed so that it is on backside 2 of post opposite net Screws will be inserted through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar with Pear Clip Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into pla...

Страница 13: ...rrect orientation refer to diagram Cleat Is to be installed so that it is on backside 2 of post opposite net Screws will be inserted through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar with Pear Clip Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secur...

Страница 14: ...opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place...

Страница 15: ...osite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Ey...

Страница 16: ...te net Screws will be inserted through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation of 4 collar on post From top of pole slide the ope...

Страница 17: ...d through post and cleat and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note orientation of 3 collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation of 4 collar on post From top of pole slide the open eyebolt collar into positio...

Страница 18: ...and secured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position and rotate approx 45 cl...

Страница 19: ...ecured on opposite of net side using self locking hex nuts and cap nuts refer to diagram Mid Collar Open Eyebolt Note 3 orientation of collar on post From top of pole slide the open eyebolt collar into position refer to diagram and secure into place Mid Collar with Shackle Note orientation 4 of collar on post From top of pole slide the open eyebolt collar into position and rotate approx 45 clockwi...

Страница 20: ...s into place if applicable Installation Notes View above is from net side of post field of 1 play Caution slowly lower posts into sleeves 2 Dropping post into sleeve may result in damage to the stop bolt Make sure all posts are orientated correctly 3 Pulley system towards field of play and cleet away from field of play All lower horizontal cable collars should face field of play Once posts are cor...

Страница 21: ... using an anchor 2 shackle Route cable to Left End Post Snap cable into Pear Clips of the Inner 3 Posts along the way and route inside of shackle on Corner Posts Before assembling Clamped Cable Loop End fully open the 4 turnbuckle With anchor shackle and thimble inplace run cable thru the shackle as 5 shown Pull slack out of cable and mark vinyl sleeve approximately 4 from thimble end Strip vinyl ...

Страница 22: ... Crimped Cable End to Right End Post Large Eyebolt using an 2 anchor shackle Route cable to Left End Post Make sure to route cable thru Small 3 Large Eyebolts installed to top of wall Before assembling Clamped Cable Loop End fully open the 4 turnbuckle With anchor shackle and thimble inplace run cable thru the shackle as 5 shown Pull slack out of cable and mark vinyl sleeve approximately 4 from th...

Страница 23: ...nd they should be centered as close as possible to its coinciding post After Brass Rings have been secured to net clip ring 4 into it s posts hoist system Pear Clip as shown in Detail B As net is being raised make sure to secure net sides to 5 the end post vertical support cables using provided Pear Clips refer to Detail C Pear Clips should be spaced approx 12 or 9 net squares Once net has been co...

Страница 24: ...st and they should be centered as close as possible to its coinciding post After Brass Rings have been secured to net clip ring 4 into it s posts hoist system Pear Clip as shown in Detail B As net is being raised make sure to secure net sides to 5 the end post vertical support cables using provided Pear Clips refer to Detail C Pear Clips should be spaced approx 12 or 9 net squares Once net has bee...

Страница 25: ...d they should be centered as close as possible to its coinciding post After Brass Rings have been secured to net clip ring 4 into it s posts hoist system Pear Clip as shown in Detail B As net is being raised make sure to secure net sides to 5 the end post vertical support cables using provided Pear Clips refer to Detail C Pear Clips should be spaced approx 12 or 9 net squares Once net has been com...

Отзывы: