background image

Hex Head Bolts(M10) 

&

 Washer(M10)-S 

&

 Lock Nut(M10)

I

NSTALLATION DIAGRAM

S

TEP 1

S

TEP 2

Align the two 

Frame Half on either side of the Shank. Insert the four Hex Head Bolts(M10) through the 

two Frame Half & Shank. 

Install Lock Nut(M10) & Washer(M10)-S on the Hex Head Bolts(M10).
Place the two Connection Plate onto the front and back of the frames. Install Carriage Bolt(M8) through the outside of the 
frames ( Carriage Bolt(M8)-L for two holes in the upper part of the Plate; Carriage Bolt(M8)-S for two holes in the lower part of 
the Plate ). Add Washers(M8) and tighten with Lock Nuts(M8) to the inside of the frames.  

Connect the 

Hitch Tube to Shank with Hex Head Bolt(M12), tighten the bolt with Washer(M12) & Lock Nut(M12).

FRAME HALF

SHANK

HITCH TUBE

CONNECTION PLATE

Carriage Bolt(M8)-L 

&

 

Washer(M8) 

&

 

Lock Nut(M8)

Carriage Bolt(M8)-S 

&

 

Washer(M8) 

&

 

Lock Nut(M8)

Hex Head Bolts(M12) 

&

 Washer(M12) 

&

 Lock Nut(M12)

I

NSTRUCTION MANUAL

AAPRODUCTS INC.

F

or Technical Support Call:1-888-806- 3972 / 626-332-4245

Отзывы: