A.R.I. Eliptix R-30 SRM 3W Скачать руководство пользователя страница 11

R-30 SRM 

 

 

 

 

 

 

 
 

2.

 

Make sure that there is a downstream flow demand

3.

 

Turn the #

2

a pilot valve’s locking nut counter clockwise, until it touches the adjusting bolt head. 

4.

 

Make sure that the 

3

-way selector [

3

] on its “AUTO” position. 

5.

 

Turn the #

2

a pilot valve’s adjusting bolt clockwise until valve starts to open. 

6.

 

To  increase  the  downstream  pressure,  turn  the  adjusting  bolt  clockwise,  one  turn  at  a  time,  allowing  sometime 
between turns for the valve to respond. Downstream pressure is shown on your pressure gauge.  Continue until 
required pressure is reached. 

7.

 

To  decrease  the  downstream  pressure,  turn  the  adjusting  bolt  counterclockwise,  one  turn  at  a  time,  allowing 
sometime  between  turns  for  the  valve  to  respond.  Downstream  pressure  is  shown  on  your  pressure  gauge. 
Continue until required pressure is reached. 

8.

 

When the required pressure is reached, prevent the adjusting bolt from turning, and turn the locking nut clockwise 
until it touches the pilot bonnet. Tighten the nut carefully. 

 

The pressure Sustaining Application: 

1.

 

The following is a general description of the Pressure Sustaining Application - Pilot 

2b

The pressure-sustaining  pilot is  designed to  maintain a minimal preset upstream  pressure by releasing excessive 
pressure to the downstream system. 

When  the  line  upstream  pressure  rises  above  the  preset  point  the  valve  slightly  opens  to  release  the  excessive 
pressure to the downstream system and maintain the upstream pressure at the pre-set level. 

When the upstream pressure drops below the setting the valve closes. 

Pipeline water flows constantly through the control loop. The pilot senses the  upstream pressure through its #

1

 

port.  

When the upstream pressure is higher than the pilot's pressure settings, the pilot decreases the internal pressure 
of the control chamber, causing the valve's diaphragm to slightly open and decrease the upstream pressure back 
to the required settings level. 

When the upstream pressure is lower than the pilot's pressure settings, the pilot increases the internal pressure of 
the control chamber, causing the valve's diaphragm to slightly close and increase the upstream pressure back to 
the required settings level. 

2.

 

Make sure that there is a downstream flow demand

3.

 

Make sure that the upstream pressure is higher or equal to the required pressure. 

4.

 

Turn the #

2b

 pilot valve’s locking nut counter clockwise, until it touches the adjusting bolt head. 

5.

 

Turn adjusting bolt counter-clockwise until the valve starts to open. 

6.

 

To  increase  upstream  pressure,  turn  the  adjusting  bolt  of  the  #

2

b  pilot  clockwise,  one  turn  at  a  time,  allowing 

sometime  between  turns  for  the  valve  to  respond.  Downstream  pressure  is  shown  on  the  pressure  gauge  (

5b

). 

Continue until required pressure is reached. 

7.

 

To decrease upstream pressure, turn the adjusting bolt counterclockwise, one turn at a time, allowing sometime 
between turns for the valve to respond. Continue until required pressure is reached. 

8.

 

When  required  pressure  is  reached,  prevent  the  adjusting  bolt  from  turning,  and  turn  the  locking  nut  clockwise 
until it touches the pilot bonnet. Tighten the nut carefully. 

 

 

 

Содержание Eliptix R-30 SRM 3W

Страница 1: ...cape and infrastructure applications The R 30 series has an innovative elliptic shaped diaphragm that integrates well with a wide variety of regulating control pilots solenoids and control accessories...

Страница 2: ...n 6 2 INSTALLATION 7 2 1 Pre installation requisites 7 2 2 Installation procedure 8 2 3 Initial Start up The Control Valve 9 2 4 Initial Set up The Pressure Reducing and Sustaining Application 10 3 OP...

Страница 3: ...oever whether caused by accessing and or relying upon this Disclaimer and or in any document enclosed hereto including without limitation any links procedures or materials A R I shall NOT assume any l...

Страница 4: ...prior warning Make sure that allproducts outlet portsarenotdirectedtowardelectricalelements pumps orpeople 8 Always open and close valves slowly and gradually 9 Please note that the maximum working pr...

Страница 5: ...ulations set for handling this type of fluid 3 Before disconnecting the product from the system and before releasing the residual pressure do NOT loosen or unscrew the product bolts removeanyprotectio...

Страница 6: ...ons 2 Make sure that all the tools ladders lifting devices etc used during the maintenance procedures are taken away from the product area and stored 3 Remove grease and fat material residues in order...

Страница 7: ...Before installing the valve flush the pipeline to remove scale dirt and other particles that might affect the valve performance 3 Carefully remove the valve from the shipping package Unload all the va...

Страница 8: ...f the control valve 12 12a Air valves upstream and downstream of the control valve 15 Quick pressure relive valve downstream of the control valve 16 3 Turn the 3 way manual selector ball valve 3 to Cl...

Страница 9: ...2a slowly clockwise one turn at a time Wait few seconds between turns allowing the valve to react until the downstream pressure reaches the required level water starts to flow to the pipeline 7 Gradu...

Страница 10: ...ontrol chamber by letting water enter the control chamber through its port 4 causing the valve s diaphragm to slightly close and decrease the downstream pressure back to the required settings level Wh...

Страница 11: ...e set level When the upstream pressure drops below the setting the valve closes Pipeline water flows constantly through the control loop The pilot senses the upstream pressure through its 1 port When...

Страница 12: ...ease note By doing so you will have no control over the downstream pressure it is possible that your system will be exposed to excessive pressure 2 To manually close the valve turn the manual 3 way se...

Страница 13: ...ally inspect the valve s diaphragm for any tears 2 Every 12 months inspect the valve s operation and clean the Finger Filter 3 Check the downstream pressure adjust if required 4 2 Storing the valve It...

Страница 14: ...off the water supply to the valve Remove the bonnet and diaphragm remove the foreign object and check that the diaphragm body and cover are not damaged 2 The diaphragm is damaged 2 The valve is consta...

Страница 15: ...R 30 SRM 6 DIMENSIONAL DRAWING...

Страница 16: ...ble nor does this warranty extended to any consequential or incidental damages or expenses of any kind or nature regardless of the nature thereof including without limitation injury to persons or prop...

Отзывы: