18
G20
G30
G31
Inlet pressure
mbar
20
30
37
Burner pressure
mbar
10.5
30
37
Diameter main injector
mm
3.50
1.95
1.95
Diameter pilot injector
mm
2x0.27
0.22
0.22
G20
G30
G31
G20
G30
G31
Inlet pressure
mbar
20
30
37
20
30
37
Burner pressure
mbar
12.5
30
37
12.5
30
37
Diameter main injector
mm
2.35
1.40
1.40
2.60
1.50
1.50
Diameter pilot injector
mm
2x0.27
0.22
0.22
2x0.27
0.22
0.22
Procedure:
1. Close the main gas tap in the gas
supply.
2. Demount the burner (see “Cleaning”).
3. Replace the injector of the main
burner and the pilot burner with the
correct injectors from the conversion
set (see tables above).
4.a Conversion from natural gas to
LP- gas
- Put the pressure regulation of the
gas control block out of operation.
To do this the temperature
regulating knob should be pulled
straight forward. Turn the
‘no pr’
(no pressure regulation) screw
down tight (see Figure 10).
- Seal this setting with lacquer.
- Remount the burner in reverse
order.
- Open the main gas tap.
Unit
EQ 115
EQ 155
Unit
EQH 200
Description
Description
Содержание EQ 115 G
Страница 9: ...9 Figure 3 Dimensions AOS 0481...
Страница 29: ...29...
Страница 30: ...30...
Страница 31: ...31...
Страница 32: ...32 0307 985 R1...