background image

13

Lime accumulation not only reduces the life of the equipment but
also reduces efficiency of the heater and increases fuel
consumption.

The usage of water softening equipment greatly reduces the
hardness of the water.  However, this equipment does not always
remove all of the hardness (lime).  For this reason it is
recommended that a regular schedule for deliming be maintained.
The depth of lime build-up should be measured periodically.
Heaters will have about 3” of lime build-up when the level of lime
has reached the bottom of the cleanout opening or about 1” of
lime build-up if it has reached the drain valve opening.  A schedule
for deliming should be set-up; based on the amount of time it
would take for a 1” build-up of lime.

Example 1

 =

Initial inspection, after 1 year, shows 1/2” of lime
accumulation. Therefore, the heater can be
delimed once a year.

Example 2

 =

Initial inspection, after 1 year, shows 2” of lime
accumulation. Therefore, the heater should be
delimed every 3 months.

Following are the instructions for performing some of the
recommended maintenance.  Power burner inspection and
adjustment should be performed by a competent technician.

Heater failure due to excessive lime build-up voids the warranty.

Sediment and lime scale removal may be accomplished through
the cleanout opening furnished on the heater.   The heater must
be drained, see DRAINING, before removing cleanout cover on
tank.

To dissolve and remove the more stubborn mineral deposits, A.O.
Smith UN•LIME Professional Delimer should be used.

A. O. Smith UN-LIME  Delimer is an easy to handle patented food
grade acid formulated specifically for lime scale removal from all
types of water using equipment. Available in 1 gallon (part no.
4763) and 5 gallon (part no. 4813) sizes.  Hydrochloric acids are
not recommended for use on glass-lined tanks.

A. O. Smith Form no. 4800, entitled, “Why, When and How”,
describes tank cleaning methods and materials

.  

UN•LIME and

the booklet may be obtained through your  A. O. Smith dealer or
distributor.

To clean heater through cleanout opening, proceed as follows:

1. Turn off water inlet valve, the heater electrical disconnect switch

and open drain valve.

2. Remove outer cover plate from lower side of heater jacket.

3. Remove plug from cleanout opening.

•  Place a short pipe nipple into the tank to extend beyond
   the heater jacket.

4. Remove lime, scale and sediment using care not to damage

the glass coatings inside the tank.

5. Remove the nipple.

6. Replace cleanout plug.

7. Follow filling instructions when restoring hot water service..

8. Check for water leakage and correct as necessary.

9. Replace outer jacket cover plate.

RELIEF VALVE

At least twice a year, the temperature and pressure relief valve
should be checked to ensure that it is in operating condition.  To
check the relief valve, lift the lever at the end of the valve several
times.  The valve should seat properly and operate freely.

 CAUTION

BEFORE MANUALLY OPERATING THE VALVE, MAKE SURE
THAT A DRAIN LINE HAS BEEN ATTACHED TO THE VALVE
TO DIRECT THE DISCHARGE TO AN OPEN DRAIN.  FAILURE
TO TAKE THIS PRECAUTION COULD MEAN CONTACT WITH
EXTREMELY HOT WATER PASSING OUT OF THE VALVE
DURING THIS CHECKING OPERATION.

If the temperature and pressure relief valve on the heater
discharges periodically or continuously, it may be due to the
thermal expansion of water in a closed water supply system, or it
may be due to a faulty relief valve.

Thermal expansion is the normal response of water when it is
heated.  In a closed system, thermal expansion will cause the
system pressure to increase until the relief valve actuation
pressure is equaled.  Then, the relief valve will open, allowing
some water to escape slightly lowering the pressure. (See
THERMAL EXPANSION Section of pages 5 and 6).

Contact your water supplier or local plumbing inspector on how
to control this situation.

ABOVE ALL, DO NOT PLUG THE TEMPERATURE AND
PRESSURE RELIEF VALVE.  THIS IS NOT A SOLUTION AND
CAN CREATE A HAZARDOUS SITUATION.

POWER BURNER

KEEP THE AREA AROUND THE BURNER CLEAR AND FREE
OF COMBUSTIBLE MATERIALS, GASOLINE OR OTHER
FLAMMABLE LIQUIDS OR VAPORS.  DO NOT OBSTRUCT

Содержание BTP-140

Страница 1: ...tilate the room then call your gas supplier or service agent Keep area clear until a service agent has been called MODELS BTP 140 140 thru 600 2500 INCLUDING BTPD BTPN COF COBT COMMERCIAL GAS OIL AND...

Страница 2: ...s Association Labortories 55 Scarsdale Road Don Mills Ontario Canada M3B 2R3 TABLE OF CONTENTS This manual is supplemented by the power burner manual All information including start up and maintenance...

Страница 3: ...OW OF COMBUSTION AND VENTILATING AIR ADEQUATE AIR FOR COMBUSTION AND VENTILATION MUST BE PROVIDED FOR SAFE OPERATION LIQUID PETROLEUM MODELS Water heaters for propane or liquefied petroleum gas LPG ar...

Страница 4: ...rsion from American Insurance Association 85 John Street New York NY 11038 Note Some gas utility companies derate the heating value of the supplied gas at high elevations Your authorized A O Smith Sta...

Страница 5: ...T 18 Inches FRONT 18 Inches BACK 0 Inches Back 6 Inches TOP 5 Inches Top 12 Inches LEFT SIDE 0 Inches LEFT SIDE 6 Inches RIGHT SIDE 0 Inches RIGHT SIDE 6 Inches NOTE If a chimney connector is used the...

Страница 6: ...RECIRCULATION OF FLUE GASES SUCH CONDITIONS CAUSE SOOTING OR RISKS OF FIRE AND ASPHYXIATION Heater must be protected from freezing downdrafts during shutdown periods Remove all soot or other obstruct...

Страница 7: ...LOCATED IN FREEZING AREAS DO NOT THREAD OR CAP THE END OF THIS LINE RESTRICTED OR BLOCKED DISCHARGE WILL DEFEAT THE PURPOSE OF THE VALVE AND IS UNSAFE DISCHARGE LINE SHALL BE INSTALLED TOALLOW COMPLET...

Страница 8: ...OM THE SUPPLY PRESSURE TEST BY CLOSING THE MANUAL GAS SHUTOFF VALVE BEFORE PLACING THE HEATER IN OPERATION CHECK FOR GAS LEAKAGE USE SOAP AND WATER SOLUTION OR OTHER MATERIAL ACCEPTABLE FOR THE PURPOS...

Страница 9: ...9 TYPICAL WIRE DIAGRAM BTP 270 2 500 KBTUH COF 800 2 500 KBTUH COBT 400 2 500 KBTUH TYPICAL WIRE DIAGRAM BTP 140 255 KBTUH...

Страница 10: ...10 TYPICAL WIRE DIAGRAM COF 140 720 KBTUH TYPICAL WIRE DIAGRAM COBT 140 300 KBTUH...

Страница 11: ...te to ask the agent any questions which you may have regarding the units start up operation or maintenance A MAINTENANCE section is included at the rear of this manual Any service required should be p...

Страница 12: ...finished flushing 4 Turn on the heater electrical disconnect switch MAINTENANCE SCHEDULE Component Operation Interval Required Flushing Monthly Sediment Tank Removal Semi Annually Lime Scale UN LIME...

Страница 13: ...ined through your A O Smith dealer or distributor To clean heater through cleanout opening proceed as follows 1 Turn off water inlet valve the heater electrical disconnect switch and open drain valve...

Страница 14: ...FIGURE 3 To test gate for operation gently tap gate and observe DO NOT OIL The red solid fuel tabs supplied with the draft regulator must be removed See instructions supplied with Draft Regulator TROU...

Страница 15: ...et system it will not permit the expanded hot water volume to equalize pressure with the main The relief valve must release this water or the water heater or plumbing system will be damaged When such...

Страница 16: ...ENSES Under the limited warranty the warrantor will provide only a replacement water heater or part thereof The owner is responsible for all other costs Such costs may include but are not limited to a...

Отзывы: