Once demand is registered, the fan is started to vent any gases that may be present.
This phase is called pre-purge and lasts about 15 seconds.
The icon is activated.
The message PRE PURGE appears.
During the pre-purge, the pressure switch closes.
The icon is activated.
The message PRESSURE SWITCH appears.
This is then followed by the (pre-)glow of the hot surface igniter.
The icons and are dimmed
The icon is activated.
After a number of seconds pre-glow, the gas control valve is opened and ignition
takes place.
The icon is activated.
The message IGNITION appears.
After ignition, the flame is detected and the appliance will be running. This means
that actual heating has started:
The icon is dimmed.
The icon is activated.
The message RUNNING appears.
When the water is up to temperature, the heat demand ceases and the post-purge
starts. This takes about 25 seconds.
The icons , and are dimmed.
The icon is activated.
The message POST PURGE appears.
2.
-
-
3.
-
-
4.
-
-
5.
-
-
6.
-
-
-
7.
-
-
-
26
User part
Содержание BFC-120
Страница 6: ...6...
Страница 13: ...User part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 13...
Страница 14: ...14...
Страница 16: ...16 User part...
Страница 18: ...18 User part...
Страница 24: ...24 User part...
Страница 40: ...40 User part...
Страница 41: ...Installation Maintenance and Service part 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 41...
Страница 42: ...42 User part...
Страница 82: ...82 Installation Maintenance and Service part...
Страница 90: ...90 Installation Maintenance and Service part...
Страница 104: ...104 Installation Maintenance and Service part...
Страница 110: ...Fig Dimensions SGS 28 30 50 60 110 Installation Maintenance and Service part...
Страница 112: ...Fig Dimensions SGS 80 100 120 112 Installation Maintenance and Service part...
Страница 121: ...12 8 Declaration of conformity 0311753_SGS_28 120_II_UKUK_V2 0 2017 05 03 121...
Страница 124: ...124 Installation Maintenance and Service part...
Страница 126: ...126 Installation Maintenance and Service part...