
NEED HELP? GIVE US A CALL
877.333.7108
1. Turn off dedicated faucet.
2. Turn on COLD water supply valve.
3. Turn on kitchen faucet to release air from pipes. Once water is flowing normally, turn
off kitchen faucet.
4. Within approximately two hours, pressure will build in the system. During this time,
carefully inspect all connections and fittings for leaks.
5. After ensuring all connections and fittings are secured, turn on the dedicated faucet.
Let water flush for 2 hours.
Note: Water flow rate will be slow during initial flush. Do not drink the flushed water.
6. Once flush is complete, turn off the dedicated faucet.
Note: After initial system flush, it will take 1-3 hours for the water tank to fill.
STEP 9
Pressure Test, Check for Leaks, and Flush
1. Insert each filter cartridge into its designated location in
the system manifold by turning to the right. The guides
on each filter will ensure proper alignment within the
system manifold.
2. Once the filter is engaged, push the filter fully in
while rotating 90 degrees to the right. Continue this
step for each filter.
· Top filter: Carbon Block
· Middle filter: SmartFlow
™
Membrane
· Bottom filter: Advanced Carbon Block
STEP 8
Insert Filter Cartridges
Stage 1
Carbon Block
Stage 2
SmartFlow
™
Membrane
Stage 3
Advanced Carbon Block
7
INSTALLATION GUIDE