73
6
HH&ORVHG6\VWHPVDQG
7KHUPDO([SDQVLRQRQSDJH
6
HH:
DWHU/LQH&RQQHFWLRQVRQSDJH
,I
D
SXPS
LV
EHLQJ
LQVWDOOHG
EHWZHHQ
D
ZDWHU
KHDWHU
DQG
VWRU
DJH
WDQN
RU
RQ
D
EXLOGLQJ
UHFLUFXODWLRQORRSZLUHDFFRUGLQJWR)LJXUHRQSDJH
,I
D
SXPS
LV
EHLQJ
LQVWDOOHG
LQ
D
UHFLUFXODWLRQ
ORRS
EHWZHHQ
W
KH
ZDWHU
KHDWHU
DQG
D
FRPPHUFLDOGLVKZDVKHUZLUHDFFRUGLQJWR)LJXUHRQSDJH
W
A
TER PIPING DIAGRAMS
%HIRUHLQVWDOODWLRQRIZDWHUSLSLQJUHYLHZWKHIROORZLQJ
6
HH0L[LQJ9
DOYHVRQSDJH
6
HH'LVKZDVKLQJ0DFKLQHVRQSDJH
6
HH
7HPSHUDWXUH3UHVVXUH5HOLHI9
DOYHRQSDJH
THREE WATER HEATERS, SINGLE TEMPERATURE WITH BUILDING RECIRCULATION
NOTES:
1.
Preferred piping method
.
2.
The temperature and pressure relief valve setting shall not exceed pressure rating of any component in the system
.
3.
Service valves are shown for servicing unit. Howeve
r,
local codes shall govern their usage.
LEGEND
TEMPERA
TURE &
PRESSURE RELIEF V
A
L
V
E
PRESSURE RELIEF V
A
L
V
E
CIRCULA
TING PUMP
TEMPERA
TURE CONTRO
L
PROBE
DRAIN
FULL
POR
T
BALL
V
A
L
V
E
TEMPERA
T
URE GAGE
W
A
TER FLOW SWITCH
CHECK V
A
L
V
E
W
ARNING:
THIS DRA
WING SHOWS SUGGESTED
PIPING CONFIGURA
TION
AND OTHER DEVICES;
CHECK WITH LOCAL
CODES
AND ORDINANCES
FOR ADDITIONAL
REQUIREMENTS.
ANY
MA
TERIAL, COMPONENT
OR VENDOR CHANGE
MUST
HA
VE PRIOR
APPROV
AL
BY
THE
APPLICABLE
PRODUCT
ENGINEERING DEP
AR
TMENT
.
FINISHED
FLOOR
HOT WATER
RETURN
PIPE T&P TO
OPEN DRAIN
PIPE T&P TO
OPEN DRAIN
PIPE T&P TO
OPEN DRAIN
HOT WATER
TO FIXTURES
COLD WATER
SUPPLY
EXPANSION
TANK
Содержание 500
Страница 66: ...66 WIRING DIAGRAM Figure 58 ...