the authority having jurisdiction, must be provided with a low water
cutoff device either as a part of the boiler or at the time of boiler
installation.

 

  WARNING

UNDER NO CIRCUMSTANCES SHOULD THE EQUIPMENT ROOM
WHERE THE BOILER IS INSTALLED EVER BE UNDER NEGATIVE
PRESSURE.  PARTICULAR CARE MUST BE TAKEN WHEN
EXHAUST FANS, COMPRESSORS, AIR HANDLING EQUIPMENT,
ETC., MAY INTERFERE WITH THE COMBUSTION AND
VENTILATION AIR SUPPLIES OF THIS BOILER.

CHEMICAL VAPOR CORROSION

Heat exchanger corrosion and component failure can be caused
by the heating and breakdown of airborne chemical vapors.  Spray
can propellants, cleaning solvents, refrigerator and air conditioning
refrigerants, swimming pool chemicals, calcium and sodium
chloride, waxes, and process chemicals are typical compounds
which are corrosive.  These materials are corrosive at very low
concentration levels with little or no odor to reveal their presence.

Products of this sort should not be stored near the boiler.  Also, air
which is brought in contact with the boiler should not contain any of
these chemicals.  If necessary, uncontaminated air should be
obtained from remote or outside sources.  

Failure to observe this

requirement will void the warranty.

INSTALLATION CLEARANCES

Sufficient area should be provided at the front and sides of the
unit for proper servicing. 

 

For ease of service, minimum

clearances of 24" (61.0 cm) in the front and 18"  (46.0 cm) on
the sides are recommended.  It is important that the minimum
clearances be observed to allow service to the control box and
other controls.

  Observing proper clearances will allow service to

be performed without movement or removal of the boiler from its
installed location.  Failure to observe minimum clearances may
require removal of the boiler in order to service such items as the
heat exchanger and burners.  In a utility room installation, the
door shall be wide enough to allow the boiler to enter or to permit
the replacement of another appliance.

Two inch (5.1 cm) clearance is allowable from combustible
construction to hot water pipes.  Sufficient clearance should be
provided at one end of the boiler to permit access to heat exchanger
tubes for cleaning.

Access to control box items such as the Central Control Board,
Flame Control Boards, Power Distribution Board and wiring
harnesses is provided through a panel on the left side of the unit.
A minimum service clearance of 18" (46.0 cm) is required.

These boilers are approved for installation on noncombustible
flooring in an alcove with minimum clearance to combustibles of:
3 inches (7.6 cm) Right Side, and Back; 6 inches (15.2 cm) Top;
Front, Alcove; 12 inches (30.5 cm) Left Side; and 6 inches
(15.2 cm) surrounding the Vent.

For installation on combustible flooring use the Combustible Floor
Kit.  The combustible floor kit base adds 4" (10.1 cm) to the overall
height of the boiler. See Figure 3.

            

MODEL

COMBUSTIBLE BASE KIT NUMBER

G(B,W) - 1000

211093

G(B,W) - 1300

211093-1

G(B,W) - 1500

211093-2

G(B,W) - 1850

211093-3

G(B,W) - 2100

211093-4

G(B,W) - 2500

211093-5

Figure 3.  Boiler on Combustible Floor Base and Kit Numbers.

LEVELLING

Each unit must be checked after installation to be certain that it is level.

AIR REQUIREMENTS

  WARNING

FOR SAFE OPERATION, AN AMPLE SUPPLY OF AIR MUST BE
PROVIDED FOR PROPER COMBUSTION AND VENTILATION IN
ACCORDANCE WITH THE NATIONAL FUEL GAS CODE, ANSI
Z223.1 OR CAN/CSA-B149.1 CURRENT EDITION OR APPLICABLE
PROVISIONS OF THE LOCAL BUILDING CODES.  AN
INSUFFICIENT SUPPLY OF AIR MAY RESULT IN A YELLOW,
LUMINOUS BURNER FLAME, CARBONING OR SOOTING OF THE
FINNED HEAT EXCHANGER, OR CREATE A RISK OF
ASPHYXIATION. DO NOT OBSTRUCT THE FLOW OF
COMBUSTION AND VENTILATION AIR.

UNCONFINED SPACE

In buildings of conventional frame, brick or stone construction,
unconfined spaces may provide adequate air for combustion.

If the unconfined space is within a building of tight construction
(buildings using the following construction: weather stripping, heavy
insulation, caulking, vapor barrier, etc.), air for combustion,
ventilation, must be obtained from outdoors or spaces freely
communicating with the outdoors.  The installation instructions for
confined spaces in tightly constructed buildings must be followed
to ensure adequate air supply.

CONFINED SPACE

(a)  U. S. INSTALLATIONS

When drawing combustion and dilution air from inside a
conventionally constructed building to a confined space, such a
space shall be provided with two permanent openings, ONE
WITHIN 12 INCHES OF THE ENCLOSURE TOP AND ONE WITHIN
12 INCHES OF THE ENCLOSURE BOTTOM.  Each opening shall
have a free area of at least one square inch per 1000 Btu/hr
(22 cm

2

/k W) of the total input of all appliances in the enclosure.

Содержание 400 Series

Страница 1: ...tion and or operation of this boiler Please pay particular attention to the important safety and operating instructions as well as the WARNINGS and CAUTIONS CONTENTS PAGE DIMENSIONS CAPACITIESDATA 2 3...

Страница 2: ...ater Conn Gas Inlet Model Natural Gas Natural Gas Propane Gas Propane Gas Inches cm Inches cm Size GW GB 1000 990 000 289 95 990 000 289 95 10 25 4 8 20 3 2 1 2 NPT 2NPT GW GB 1300 1 300 000 380 74 1...

Страница 3: ...62 9 31 6 80 3 82 208 3 15 5 39 4 39 75 101 58 25 148 15 9 40 83 16 40 64 57 3 145 5 GBO GWO 1500 30 76 2 31 6 80 3 89 226 15 5 39 4 39 75 101 58 25 148 15 9 40 83 16 40 64 64 3 163 3 GBO GWO 1850 27...

Страница 4: ...TALLATION TO AVOID POSSIBLE ERRORS AND MINIMIZE TIME AND MATERIALS COST SEE FIGURES 1 THROUGH 5 AND TABLES 1 2 AND 3 This design complies with the current edition of ANSI Z21 13 CSA 4 9 for Gas Fired...

Страница 5: ...ery system will have one Central Control Board CCB one Power Distribution Board PDB one User Interface Module UIM and either two or three Flame Control Boards FCB depending on the model The Control Bo...

Страница 6: ...switch provides 120VAC from the line source to the boiler COMBUSTION AIR BLOWER Provides air for combustion process The blower settings are adjustable through the use of the air shutter however blower...

Страница 7: ...the lowest rated working pressure of any system component and a discharge capacity exceeding the total input of the water boilers supplying water to the storage tank Locate the T P relief valve a in t...

Страница 8: ...Control Board Flame Control Boards Power Distribution Board and wiring harnesses is provided through a panel on the left side of the unit A minimum service clearance of 18 46 0 cm is required These b...

Страница 9: ...unicating with the outdoors through vertical ducts two permanent openings located in the above manner shall be provided Each opening shall have a free area of not less than one square inch per 4000 Bt...

Страница 10: ...ve boiler vent collar Vent pressure should be maintained between 0 02 W C and 0 04 W C to assure proper operation For appliances with a draft hood check for spillage with mirror smoke or other device...

Страница 11: ...gas meters regulators and relief equipment 4 The minimum distance from inside corner formed by two exterior walls is 6 feet 1 8 m but 10 feet 3 1 m is recommended where possible 5 Maintain a minimum...

Страница 12: ...of the vent shall be supported to maintain clearances and to prevent physical damage or separation of joints TABLE 10 STANDARD VERTICAL VENTING CATEGORY I Extending venting over 70 feet 21 3 m may re...

Страница 13: ...gas vent pipes listed for use with Category III gas burning heaters such as stainless steel Saf T Vent by Heat Fab Inc available from A O Smith 500 Tennessee Waltz Parkway Ashland City TN 37015 Phone...

Страница 14: ...vent terminal The horizontal portion of the vent shall be supported to maintain clearances and to prevent physical damage or separation of joints Figure 8 APPLIANCE CERTIFIED EXHAUST VENT MAXIMUM AIR...

Страница 15: ...2515 Pipe joints must be positively sealed TABLE 13 DIRECT VENT HORIZONTAL EXHAUST CONFIGURATIONS Figure 9 APPLIANCE CERTIFIED EXHAUST MAXIMUM AIR INTAKE AIR INTAKE MAXIMUM MODEL CATEGORY EXHAUST VENT...

Страница 16: ...condensation within the boiler on cold starts This condensing of water vapor in the combustion area can be prevented if a portion of the system water flow is diverted past the boiler to cause an incre...

Страница 17: ...le boilers manifolded for reverse return flow The system bypass would be installed from boiler outlet to suction side of pump The boiler piping system of a hot water heating boiler connected to heatin...

Страница 18: ...he tank probe as the controlling probe Second Dip Switch SW1 1 must be set to the OFF position to limit the maximum tank probe temperature for GW applications Failure to do this will void the warranty...

Страница 19: ...WATER FLOW SWITCH PROTECTS THE BOILER IN CASE OF WATER SERVICE INTERRUPTION OR CIRCULATOR FAILURE PIPE TO OPEN DRAIN X FACTORY INSTALLED ON UNIT SUPPLIED WITH UNIT FIELD INSTALLED INSTALL THERMAL EXP...

Страница 20: ...ED DANGER TEMPERATURE SETTING SHOULD NOT EXCEED SAFE USE TEMPERATUREAT FIXTURES SEE WATER TEMPERATURE CONTROL WARNING ON PAGE 26 IF HIGHER PREHEAT TEM PERATURES ARE NECESSARY TO OBTAIN ADEQUATE BOOSTE...

Страница 21: ...92 2 841 2 577 2 372 2 197 2 109 1 962 1 757 1 611 1 464 1 347 Length of Pipe in Feet Metres Nominal Iron Pipe Size Cap 10 Ft 20 Ft 30 Ft 40 Ft 50 Ft 60 Ft 70 Ft 80 Ft 90 Ft 100 Ft 125 Ft 150 Ft 175 F...

Страница 22: ...and30Amps TABLE 18 Orifice Size for Natural and Propane LP Gases U S and Canada Installations for high altitude up to 4 500 ft 1 372 m Drill Size Input Rating Number of Model BTU HR Burners Natural 4...

Страница 23: ...23 GB GW 2100 GB GW 2500 GB GW 1000 1500 GAS MANIFOLD ASSEMBLY GB GW 1850 Figure 14 GB GW 1000 2500 Gas Manifold Assembly Diagrams...

Страница 24: ...24 GENESIS GB GW 1000 2500 SERIES 400 WIRING DIAGRAM FIGURE 15...

Страница 25: ...25...

Страница 26: ...26 GENESIS GB GW 1000 2500 SERIES 400 SCHEMATIC DIAGRAM FIGURE 16...

Страница 27: ...27...

Страница 28: ...28 Figure 17 CCB CENTRAL CONTROL BOARD...

Страница 29: ...29 Figure 18 FCB FLAME CONTROL BOARD Diagram...

Страница 30: ...30 Figure 19 PDB POWER DISTRIBUTION BOARD Diagram...

Страница 31: ...Installation 1 Close the systems drain valve 2 Open a nearby hot water faucet to permit the air in the system to escape 3 Fully open the cold water inlet pipe valve allowing the heater and piping to...

Страница 32: ...OLLER TO THE LOWEST SETTING 2 TURN POWER SWITCH ON APPLIANCE TO OFF POSITION 3 REMOVEACCESSPANELTOEXPOSEGASCONTROL IF YOU CANNOT REACH YOUR GAS SUPPLIER CALL THEFIREDEPARTMENT C USE ONLYYOUR HAND TO P...

Страница 33: ...A QUALIFIED SERVICETECHNICIANTOINSPECTTHEAPPLIANCEAND TOREPLACEANYPARTOFTHECONTROLSYSTEMAND ANYGASCONTROLWHICHHASBEENUNDERWATER E DO NOT OPERATEAPPLIANCE UNLESS UNIT IS FILLED WITH WATERAND WATER LINE...

Страница 34: ...dition occur the control will shut down the burner and display a red fault light as well as indicate the cause of the fault on the display The operating programs for the system are stored in permanent...

Страница 35: ...l Normally open switch that closes when the IRI Gas Valve is operating correctly This input is enabled disabled by a dipswitch on the CCB Flame Sensor Flame CCB required Returns a signal to the microp...

Страница 36: ...ns If a switch is changed power must be cycled before the change will take effect The status of all dipswitches can be observed on the system status screen on the UIM CCB FCB Dipswitches Dipswitches F...

Страница 37: ...om the controlling probe inlet or tank to the setpoint temperature If the temperature is less than the operating setpoint minus the differential temperature and the thermostat input is closed then a c...

Страница 38: ...l which means that it will begin heating the water when the temperature sensed by the control probe inlet or tank falls below the operating setpoint minus the differential setpoint for stage 1 It will...

Страница 39: ...been satisfied or the Thermostat is opened the sequence moves to Post Circulate and then back to Idle If a fault occurs at any time the process jumps out of sequence and goes directly to the appropri...

Страница 40: ...iter hardware failure If the igniter does reach the minimum required amp draw of 2 8 amps the gas valve circuit is energized and the system advances to Flame Check status Check for Flame State The gas...

Страница 41: ...and minutes This error remain displayed as long as it is still valid When cleared it is moved to the Error History Screen The system will automatically jump to this screen OPERATING SETPOINT ADJUSTME...

Страница 42: ...keys or press Menu key to go to the menu screen If a small down arrow appears in the lower right hand corner then there is off screen content below what is displayed Press the down arrow to scroll do...

Страница 43: ...checked by disconnecting the outlet probe from the CCB and reading the resistance across the two active pins on the connector at the end of the probe cable The value should be approximately 0 ohms whe...

Страница 44: ...rner venturi and ports are free of foreign matter 4 Clean burners with bristle brush and or vacuum cleaner DO NOT distort burner ports 5 Reinstall burners in unit Ensure that all the screws on the bur...

Страница 45: ...y The installer must provide a filtering system in the air inlet to the boiler if dust dirt or construction dirt can be pulled into the boiler through the inlet air piping Periodically clean air filte...

Страница 46: ...einstall return header casting Flush system Note Removal of the heat exchanger is not required CAUTION IF HEAT EXCHANGER MAINTENANCE REQUIRES TUBING REPLACEMENT SPECIAL PROVISIONS SHALL BE TAKEN TO EN...

Страница 47: ...WARRANTIES Implied warranties including any warranty of merchantability imposed on the sale of this boiler under state law are limited to one 1 year duration for the boiler or any of its parts Some st...

Страница 48: ...48 500 Tennessee Waltz Parkway Ashland City TN 37015 Phone 800 433 2545 www hotwater com E Mail parts hotwater com...

Отзывы: