13
Vertical contact toaster
P/N 1011097 Rev. A 03/12
A.J. Antunes & Co.
figure 12. removing conveyor belt chain
Master
Links
checking the conveyor belt chains
(every 3–6 months)
nOte: the bun thickness compression Knobs
(figure 3) must be set to “6 & 6” prior to measur-
ing or removing or reinstalling the conveyor belt
chains.
measUrInG cOnVeyOr belt chaIns
1. Remove the Bun Wheel Assembly, Bun Chute,
Pan, and Heat Shield (Figure 1). Remove the
Bun Compression Cover Plate and set the Bun
Thickness Compression Knobs to 6 & 6.
2. Open both Conveyor Covers and pull the Belt
Wrap Hinge Pin out of the zipper (Figure 9).
3. Pull the Conveyor Chain away from the edge of
the toaster (Figure 12).
4. Hold a U.S. Dime horizontally between the frame
and the chain (Figure 12).
5. If the gap is significantly wider than the coin,
REMOVE links as described.
6. Repeat on the opposite side of the toaster.
remOVInG cOnVeyOr belt chaIn lInKs
1. Turn the power off, unplug the power cord, and
allow the unit to cool before proceeding.
figure 11. measuring conveyor belt chain
maIntenance (continued)
2. Remove the Butter Wheel assembly, Bun Chute,
and Heat Shield. Remove the cover from the
Compression Controls and set the Compression
Control Knobs to 6 & 6.
3. Remove the Conveyor Cover and pull the Belt
Wrap Pin out of the zipper.
4. Remove the Belt Wrap.
5. Locate the two Master Links as shown in Figure
zx.
6. Remove the Master Link on both the left and right
side of the chain.
7. Remove one complete link from the chain.
Photo shows how the
master link connection
is made.
Master Link