The ‘Hilltopper-20’ Transceiver K1SWL rev. 15 October 2018
10
you’ve installed the IC, ensure that all leads are seated in the socket.
• Install the 2-pin male header at the location identified as ‘CAL’ . (Keep the mating 2-pin female
jumper aside until construction is complete.)
GROUP 4 ASSEMBLY:
•
Install all components highlighted below. A detailed assembly sequence follows the
illustration.
• Install J3 and J4.
• Install Install U6 (78L05). Observe proper orientation on the board.
•
I
n
s
t
a
l
l
a
l
l
(
q
t
y
.
1
5
)
0
.
1
µ
F
c
a
p
a
c
i
t
•
I
n
s
t
a
l
l
a
l
l
(
q
t
y
.
1
5
)
0
.
1
µ
F
c
a
p
a
c
i
t
•
I
n
s
t
a
l
l
a
l
l
(
q
t
y
.
1
5
)
0
.
1
•
I
n
s
t
a
l
l
a
l
l
(
q
t
y
.
1
5
)
•
I
n
s
t
a
l
l
a
l
l
(
q
•
I
n
s
t
a
l
l
a
l
l
(
•
I
n
s
t
a
l
l
a
l
l
(
•
I
n
s
t
a
l
l
a
l
•
I
n
s
t
a
l
l
•
I
n
s
t
a
l
l
a
•
I
n
s
t
a
l
l
a
l
l
•
I
n
s
t
a
l
l
a
l
l
•
I
n
s
t
a
l
l
•
I
n
s
t
a
l
l
a
l
l
•
I
n
s
t
a
l
l
a
l
•
I
n
s
t
a
l
l
•
I
n
s
t
a
l
l
a
l
l
(
q
J2
•
I
n
s
t
a
l
l