
Installation Manual
| VISIX PTZ Network Camera
10225 Westmoor Drive, Suite 300, Westminster, CO 80021 | www.3xlogic.com | (877) 3XLOGIC
30
When the speed dome is installed in environment where is relatively insulating to the earth, e.g., cement pole or
cement wall, then only the control center requires proper grounded locally. Refer to the following figure.
Figure A-‐2 Grounding in Cement Pole/Wall Installation
Power
Power
Power supply board
Power supply board
Video cable
Control line
Cement pole/wall
Display
Operating center
Keyboard
DVR
UPS
GND
GND
GND
GND
1.5m underground