![3Ware 9650SE-8LPML-SGL Скачать руководство пользователя страница 34](http://html1.mh-extra.com/html/3ware/9650se-8lpml-sgl/9650se-8lpml-sgl_manual_3253806034.webp)
Chapter 3. Installing the Battery Backup Unit
30
3ware 9650SE Serial ATA RAID Controller Installation Guide
Tools and equipment required
Slot-head screwdriver
Grounding strap
Battery Backup Unit (BBU) and battery
3ware 9650SE series controller
Installation Overview
The Battery Backup Unit (BBU) is comprised of two pieces: the
battery module and the BBU control module.
These pieces attach to the controller at the points illustrated in
Figures 21 through 23:
a
Clips on the battery module match to slots on the half-height
controllers (4-port and 8-port) and holes on the full-height
controllers (12-port, 16-port, and 24-port).
b
Connector on the BBU mates to receptacle on the controller.
c
Post on the BBU mates to post hole on the controller.
Figure 21. Points of connection on the BBU <>
Note:
The battery will drain if it is plugged into the BBU and
there is no power to the unit. Wait to plug the battery into the
BBU until the system is ready for use.
a) Clips
b) BBU connector
c) Post
Содержание 9650SE-8LPML-SGL
Страница 1: ...3ware 9650SE Serial ATA RAID Controller PN 720 0158 00 March 2007 Installation Guide ...
Страница 45: ......