3onedata IES3016 Series Скачать руководство пользователя страница 3

NO. 

MDI signal 

MDI-X signal 

TX+ 

RX+ 

TX- 

RX- 

RX+ 

TX+ 

RX- 

TX- 

4, 5, 7, 8 

— 

— 

Note

“TX±”Transmit Data±

“RX±”Receive Data±

“—”Not Use. 

MDI (straight-through cable) 

 

MDI-X (Cross over cable) 

 

MDI/MDI-X auto connection makes switch  easy to use for 

customers without considering the type of network cable. 

 

100Base-FX Fiber port   

100Base-FX full-duplex SM or MM  port, SC/ST/FC  type .The 

fiber port must be used in pair, TX (transmit) port connect remote 

switch’s  RX (receive) port; RX (receive) port connect remote 

switch’s TX (transmit) port. 

The optical fiber connection supports the line to instruct enhance 

the reliability of network effectively

Suppose

:  If you make your own cable, we suggest labeling the 

two sides of the same line with the same letter (A-to-A and 

B-to-B, shown as below, or A1-to-A2 and B1-to-B2). 

 

LED Indicator

 

LED indictor light on the front panel of product, the function of 

each LED is described in the table as below. 

System Indication LED 

LED 

State   

Description 

PWR 

(P1, P2) 

ON 

Power is being supplied to power 

input PWR input 

OFF 

Power is 

not

 being supplied to 

power input PWR input 

RUN 

ON/OFF 

System is not running well 

Blinking 

System is running well 

Link/ACT 

(1~16) 

ON 

Port connection is active 

Blinking 

Data transmitted 

OFF 

Port connection is not active 

ALARM 

ON 

Has alarm information 

OFF 

No alarm information 

Installation

 

Before installation, confirm that the work environment meet the 

installation require, including the power needs and abundant 

space. Whether it is close to the connection equipment and other 

equipments are prepared or not.   

1. Avoid in the sunshine, keep away from the heat fountainhead or 

the area where in intense EMI. 

2. Examine the cables and plugs that installation requirements. 

3. Examine whether the cables be seemly or not (less than 100m) 

according to reasonable scheme.   

4. Power: DC dual power supply series products 12 ~ 48VDC 

AC single power supply series products 100~240VAC/DC 

5. Environment: working temperature -40

75

 

Storage Temperature: -40

85

 

Relative humidity 5%

95% 

DIN Rail Installation 

In order to use in industrial environments expediently, the product 

adopt 35mm DIN-Rail installation, the installation steps as below: 

1.

 

Examine the DIN-Rail attachment 

2.

 

Examine DIN Rail whether be firm and the position is 

suitability or not. 

3.

 

Insert the top of the DIN-Rail into the slot just below the 

stiff metal spring. 

4.

 

The DIN-Rail attachment unit will snap into place as shown 

below. 

 

Wiring Requirements 

Cable laying need to meet the following requirements,

 

1.

 

It is needed to check whether the type  and specification of 

cable match the requirement before cable laying; 

2.

 

It is needed to check the cable is damaged or not, factory 

records and quality assurance booklet before cable laying; 

3.

 

The required cable specification, quantity, direction and laying 

position need to match construction requirements, and cable 

Содержание IES3016 Series

Страница 1: ... meet all kinds of Industrial environment requirement It can use in power water conservancy transportation area etc The switch support AC power input series and DC power input series optional Packing list Please check the packaging and accessories by your first using Industrial Ethernet switch ⅹ 1 User manual ⅹ 1 Certificate of quality ⅹ 1 Warranty card ⅹ 1 Please inform us or our distributor if y...

Страница 2: ...nnection protection Voltage input range is 12 48VDC terminal block defined as V1 V1 V2 V2 AC Series Switch The Industrial Ethernet switches have singe power and redundancy power two kinds of power input The singe power AC series top panel provides 3 bit terminal block for AC100 240V power entered L PG N Important notice 1 Power ON operation first of all insert power cable s terminal block into dev...

Страница 3: ... Before installation confirm that the work environment meet the installation require including the power needs and abundant space Whether it is close to the connection equipment and other equipments are prepared or not 1 Avoid in the sunshine keep away from the heat fountainhead or the area where in intense EMI 2 Examine the cables and plugs that installation requirements 3 Examine whether the cab...

Страница 4: ...optic fiber port 100Base FX SC ST FC connector support single mode 20 40 60 80Km optional multi mode 2Km wavelength 1310nm 1550nm Transfer distance Twisted cable 100M standard CAT5 CAT5e cable Multi mode 1310nm 2Km Single mode 1310nm 20 40 60Km 1550nm 80 100 120Km LED indicator Run indicator Run Interface indicator Link 1 16 Power supply indicator PWR P1 P2 Power supply DC Series Input voltage 12 ...

Отзывы: