Page 14
3M
™
Straight Line Laminator Single Head Manual
|
Original Assembly and Operation Instructions
Effective: August 2022
4.5 Process Sequence
4.5.1 Application Process SGA 500 R with Product Guide
Figure 6
1 . The unit is set up according to chapter
6.2 Setting Up the Unit
.
2 . Loosen the locking bolt (Figure 6C) and pull the hand lever (Figure 6D) upwards .
The swivel lever with the application roller (Figure 6B) swivels down. The unit is ready.
3 . Guide the product to be bonded over the right side onto the set-up product guide (Figure 6A) under
the application roller (Figure 6B) and push it further down the roller conveyor . Always repress the
beginning of the adhesive tape on the first product .
The compression spring holds the application roller down and thus ensures the necessary contact
pressure of the adhesive tape on the product surface.
4 . Push a second product on the roller conveyor and pass both of them under the application roller .
As soon as the first product is a little behind the application roller, cut the adhesive tape between
the two products .
NOTE: Danger in the area when cutting the tape.
Danger of cutting .
Wear protective gloves . Do not reach into the blade .
5 . Push another product on the roller conveyor so that the second product with the tape applied is
behind the application roller and proceed as described above .
6 . Pull the hand lever (Figure 6D) down when you finish the process in order to lift the application roller
and to fix the locking bolt again .
The swivel lever with the application remains in the upper position. The unit is not ready.
C
B
A
D