32
7.3.5
Straight Through Conversion (No Slack)
Using Two 4041 Splice Heads:
7.3.5.1
Build a piece out jumper using the DPM
Modules. Use sufficient slack to allow
mobility within the splice.
7.3.4
Straight Through Conversion:
(6" Slack Required)
7.3.4.1
Separate color groups to be spliced, i.e.,
white, red, black, etc., and begin with the pri-
mary colors, i.e. w/bl, w/o, w/g, etc., and lay
wires into splice head in consecutive order in
the
first DPM.
Note:
Turn splice head to open the rear spring
angle and to allow entry of conductors
into the rear wire retainer spring.
883641
88634
DPM
DPM
DPM
Super-Mini
To reduce splice bundle size, build piece out
jumpers using 4000D Super-Mini and 4005-
DPM Modules. Alternate Super-Mini and
4005-DPM Modules between right and left
banks.
C.O.
FIELD
Rear Spring
Place cover and crimp.
883641
7.3.4.3
Fold wires up and over themselves, across the
second body and lay wires into the rear
spring.
7.3.4.2
Lay in second DPM body and lightly tap the
body on each end set latches and reduce
movement.
883634
Body #1
Body #2
Tap Here
Tap Here
7.3.5.2
Center double head set-up into splice open-
ing.
7.3.5.3
Place appropriate piece out of jumper into
each splice head.
7.3.5.4
Place second body into each head and crimp.
7.3.5.5
Verify group to be cut.
7.3.5.6
Cut first straight through cable pair at pair 17
(y/o) of left hand splice head. After pair has
been cut, place left cut end in first wire way
of body/top (bl/w) of left splice head; place
right cut end in first wire way (bl/w) of right
splice head.
OUT
IN
883863
Note:
If pair is working, use bridge clips.