14
78-8140-3820-0-B
8.17 Finish tightening the two screws marked 'A' until the gaps between the halves under are closed or nearly
closed. Then finish tightening the screw marked 'B'. Torque all three screws to 45 in.-lbs.
Note: Do not exceed 50 in.-lbs. of torque
8.18 Trim excess mastic with snips or a knife.
Note: Do not cut, flush or pull out the mastic rope. Leave
1/8-inch (4mm) of the ends of the rope mastic
protruding.
8.19 Press the mastic flat using a finger tip.
9.0 Cable Strength Member Installation; For all loose buffer tube and
dielectric central tube cables
9.1
Remove the vinyl caps and the cable strength
member (CSM) clamps from the CSM bracket.
Position the CSM rod next to the bracket and
trim it to fit as shown.