78-0013-6389-0-A 9
12.3 Place cable glands around the free conductors and
position into the 3M
™
Indoor Building Entrance
Terminal (IBET).
12.4 Separate the feeder cable pair assigned to each IBET;
splice and bond the IBET according to section 4.0.
843017