7.14 Wire Termination:

a. Attach 4041 Splice Head to 4044 Frame

Adapter.  Snap adapter legs into diamond-
shaped cutouts in bracket.

Note:

Gold adapter must be placed in splice head
before splicing.

812176

b. Place modular connector base onto splicing

head.  The cut corner of the base should be on
the left-hand side and rear of the splicing head.

c. Select entrance cable binder group and lay

into base by color code.  Check conductor
order with check comb.  Select matching
binder group from preconnectorized short
stub.  Place body/cover on top of base,
matching the cut corners.

d. Crimp connector using the 4030, 4031 or 4036

crimping unit.

77969

Alignment
Post

Cut
Corner

791476

k.

791475

Wire Guide

Pair Separator

e. To terminate a 4187 Extension Stub onto the

preconnectorized short stub, use either a 4255
Hand Presser or an MS

2

 Splicing Head.

f. To terminate extension stub to preconnectorized

short stub using the 4255 Hand Presser, refer to
the 4255 Hand Presser Instruction Bulletin.

g. To terminate extension stub to preconnectorized

short stub using the MS

2

 Splicing Head, remove

the three screws, color-coded wire guides and
blue pair separator from splicing head.

Note:

Gold adapter is not used in this
application.

8.0 Multiple Terminal Installation

8.01 Vertical Stacking

The design of the integral splice chamber and
grooved clamp halves to and from that chamber,
enables up to three PETs of same pair count to
be stacked vertically (dependent on cable
diameter).  Vertical stacking is used when the
entrance cable pair count is greater than the
capacity of a single PET or when the installation
design requires that only a portion of entrance
cable pairs be initially terminated.

7.15 After termination is complete, neatly bundle wire

and modular connectors and lay in splice
chamber.  Close chamber door and secure
with screws supplied or any #8-32 screw
1/4" - 1/2" (6 mm - 13 mm) long to meet UL
requirements.

7.16 Scotchlok

TM

 UR and UY Connectors may be

substituted for the modular connectors on the
preconnectorized short stub.  Use Scotchlok
E-9 Series Tools for proper crimping of
connectors.

832585

913962

i. Crimp connector using the 4030, 4031 or 4036

crimping unit.

j. For wire termination onto the

preconnectorized 710-type connector short
stub, refer to Bell System practice, section
632-205-220.

k. Remove clamp from traverse bar assembly

and mount traverse bar 3" (76 mm) from PET
with two #12 wood screws (not supplied).

4

7.13 After positioning PST as close as possible to

terminal side, continue core removal to collapse
PST over clamp halves.  Complete core removal.

h. Place extension stub into splicing head.  Place

short stub with corresponding binder group on
top.  Use green base retainer posts for
alignment.

 DOCUMENT

 OBSOLETE

Содержание 4488

Страница 1: ...July 1996 78 8113 4488 2 4488and4588 ProtectedEntranceTerminals Instructions UnderwritersLaboratories UL Listed DO CUM ENT O BSO LETE ...

Страница 2: ...j Pair count log label k Quiet Front Terminal screws l 4327 Pair Test Probe 4347 Pair Test Clip 1 01 The terminals contain the following features and components a A short stub with one end preconnectorized to a flame retardant MS2TM modular connector body cover the other end prewired to the protector receptacle Note The 4488 B 4488 R 4588 B and 4588 R PETs contain a 710 type splice connector inste...

Страница 3: ...Alvyn cable preconnectorized on one end with a modular connector base The stub can be crimped to the preconnectorized short stub to provide an extension to the entrance cable They are available in 25 50 and 100 pair sizes 2 03 4327 SS Pair Probe The 4327 SS Pair Probe provides electrical access to a pair of 4320 Self Strip contacts 2 04 4347 Pair Test Clip The 4347 Pair Test Clip allows for test c...

Страница 4: ...land and position as shown in drawing based on size of the terminal Slowly unwind loose core tail in a counterclockwise direction while edging PST toward terminal side as the core is removed PET Pair Count 25 50 100 Maximum Diameter 1 08 27 mm 1 45 37 mm 1 80 46 mm MinimumDiameter 42 11 mm 63 16 mm 1 00 25 mm Entrance Cable 7 11 Cable diameters allowed in the area of PST application are as follows...

Страница 5: ...cal Stacking The design of the integral splice chamber and grooved clamp halves to and from that chamber enables up to three PETs of same pair count to be stacked vertically dependent on cable diameter Vertical stacking is used when the entrance cable pair count is greater than the capacity of a single PET or when the installation design requires that only a portion of entrance cable pairs be init...

Страница 6: ...rresponding PETs using the clamp halves as an entry guide 843017 g Install the blank plate into the unused cable entry slot This must be done to maintain UL Listing Note For wire termination onto preconnectorized short stub refer to the MS2 Splicing Instruction Bulletin h When the installation design requires that only a portion of entrance cable pairs be initially terminated e g 100 pair entrance...

Страница 7: ...jumper wire below the connected cap 9 03 Testing 4488 Terminals Note Binding post screw heads have been coated with a nonconductive material resulting in a Quiet Front condition Use only approved test equipment on block a Connect test set to talk block 791495 842987 Tip Cap Ring Cap Ring Tip Cap Test Ports b Attach 4347 Test Clip onto washers of tip and ring of one pair b Insert pins in test ports...

Страница 8: ...he Seller which are not contained in the Seller s current publications shall have no force or effect unless contained in an agreement signed by an authorized officer of the Seller The statements contained herein are made in lieu of all warranties expressed or implied including but not limited to the implied warranties of merchantability and fitness for a particular purpose which warranties are her...

Отзывы: