
12
C
HAPTER
2: I
NSTALLATION
Installation Overview
Figure 3 summarizes the overall installation procedure for the PathBuilder
S330/S310 switch.
Figure 3
General Installation Procedure
For detailed descriptions of the installation steps, see “Installation Procedures”
later in this chapter.
Prepare the Site:
Verify clearance around the shelf site
Step 1
Install the optional modules
Install the unit in the rack
Step 2
Step 3
Step 4
Step 5
Connect AC or DC power and
Connect I/O cabling and wiring
Connect the management
Fabricate and run cabling and wiring
(optionally) the RPS system
terminal
(optional)