INSTALL WET BOOM
SPACER PLATE
This process will create the clearance necessary for
the new square tube and wet boom assembly.
Figure 4
Step 1
Remove bolt assemblies (1).
Figure 5
Step 2
Install two 4" spacer plates (1).
From Center Section Kit
Step 3
Install 5/16" x 2" bolts (2) with flat washers
on the top and bottom and the Nylock nut.
Hardware Kit B from Center Section Kit
Repeat Steps 1-3 for all wet boom support assemblies.
INSTRUCTIONS 360 Y-DROP
JOHN DEERE 4730/4830
II.
Figure 4
Figure 5
360YIELDCENTER.COM
1
2
1
4