24
25
2VV.
Creating innovative solutions for you and your business since 1995.
ver.3 29-04-20
READ CAREFULLY!
Before the initial commissioning, check:
● that the unit is properly fastened to the supporting structure
● that the unit is properly closed and that all necks are connected to pipes or are fitted with rain blinds to
prevent water from coming into contact with any moving or heating parts.
● that the wiring is well connected, including earthing and protection against external start-up.
● that all the accessories are well connected.
● that the condensate drain is well connected to the drainage piping (units with cooling).
● that the connection complies with the instructions herein.
● that no tools or other objects have been left inside the unit – it could result damage.
CAUTION!
● Any intervention or modifications to the internal connection are forbidden and shall result on loss of warranty.
● We recommend using the accessories we supply. In case of doubt regarding the use non-original accessories, contact
2VV.
0
1
7. COMISSIONING