
IN
S
T
A
L
L
A
T
IO
N
R
A
C
K
I
N
S
T
A
L
L
A
T
IO
N
-
3
4
4. Move both bar (4) and snare bracing rod
(4a) up at the same time. Then fit the loop to
the left center post (1L). Fasten the wing
nuts.
5. Insert cross bar (5) into the left center post
(1L). Fasten its wing nut. Insert side post (2)
into the other side.
6. Insert cross bar (5) into right center post
(1R). Fasten its wing nut. Insert side post
(2)
into the other side.
7. Insert cross bar (3) into both center posts (1)
and fasten its wing nuts.
③
⑤
④
⑤
②
①
①
4a
②
Содержание SpeedLight Kit
Страница 1: ...SpeedLight Kit USER S MANUAL BEDIENUNGSANLEITUNG ...
Страница 2: ...CONTENTS TABLE INSTALLATION 1 PLAYING 9 AUFBAU 11 SPIELEN 19 www 2box drums com ...
Страница 24: ...V1 2 ...