7
TM
TUB RACK ASSEMBLY MANUAL
8.
7.
Drill holes.
Use 3mm drill bit for pilot hole
followed by 10mm drill bit for
final hole.
Tip:
De-bur holes and apply
enamel paint on bare metal to
avoid rust.
Remove backing from protective rubbers
and stick down over holes flush with
inside lip.
Place tub rack on top of ute tub.
Align holes and fit M10 Hex bolts to
all 4 legs.
Once bolts, washers and nuts have
been seated, tighten all.
Fixings used:
8 M10 50mm Hex bolts (F)
4 M10 30mm Hex bolts (H)
12 M10 Nuts (J)
24 M10 Flat washers (L)
12 M10 Spring washers (N)
Vehicle mounting
Содержание TUB RACK
Страница 1: ...TM TUB RACK USER MANUAL ...
Страница 2: ......
Страница 4: ...2 TM TUB RACK ASSEMBLY MANUAL Parts List ...
Страница 12: ......