background image

F

IND

 

OUT

 

MORE

ON

 

THE

 

WEB

.

WILBURCURTIS.COM

1

F

IND

 

OUT

 

MORE

ON

 

THE

 

WEB

.

WILBURCURTIS.COM

Gemini Digital Brewers – Instructions

FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO

WWW.WILBURCURTIS.COM

This appliance is designed for commercial use. Any servicing other than cleaning and maintenance should be performed by an
authorized Wilbur Curtis service center.

• 

Do NOT immerse the unit in water or any other liquid

• 

To reduce the risk of fire or electric shock, do NOT open top panel. No user serviceable parts inside. Repair should be done

only by authorized service personnel.

• 

Keep hands and other items away from hot parts of unit during operation.

• 

Never clean with scouring powders, bleach or harsh implements.

Conventions

Conventions

Conventions

Conventions

Conventions

W

W

W

W

WARNINGS – 

ARNINGS – 

ARNINGS – 

ARNINGS – 

ARNINGS – TTTTTo help a

o help a

o help a

o help a

o help avoid personal injur

void personal injur

void personal injur

void personal injur

void personal injuryyyyy

Important Notes/Cautions – from the factory

Important Notes/Cautions – from the factory

Important Notes/Cautions – from the factory

Important Notes/Cautions – from the factory

Important Notes/Cautions – from the factory

Sanitation Requirements

Sanitation Requirements

Sanitation Requirements

Sanitation Requirements

Sanitation Requirements

YYYYYour Curtis 

our Curtis 

our Curtis 

our Curtis 

our Curtis ADS System is F

ADS System is F

ADS System is F

ADS System is F

ADS System is Factor

actor

actor

actor

actory Pre-Set and Read

y Pre-Set and Read

y Pre-Set and Read

y Pre-Set and Read

y Pre-Set and Ready to Go… Right from the Carton.

y to Go… Right from the Carton.

y to Go… Right from the Carton.

y to Go… Right from the Carton.

y to Go… Right from the Carton.

Following are the Factory Settings for your interLock Coffee Brewing Systems:

• Brew 

• Brew 

• Brew 

• Brew 

• Brew TTTTTempera

empera

empera

empera

emperature = 

ture = 

ture = 

ture = 

ture = 200°F

• Water Bypass = 

• Water Bypass = 

• Water Bypass = 

• Water Bypass = 

• Water Bypass = On for 36 cup only

• Brew Volume = 

• Brew Volume = 

• Brew Volume = 

• Brew Volume = 

• Brew Volume = Set to 36 cup vessel requirements. • Sleep Mode = 

• Sleep Mode = 

• Sleep Mode = 

• Sleep Mode = 

• Sleep Mode = Off

System Requirements:

• Water Source

• Water Source

• Water Source

• Water Source

• Water Source   20 – 90 PSI (Minimum Flow Rate of 1 GPM)
• Electrical:

• Electrical:

• Electrical:

• Electrical:

• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model.

SETUP STEPS

SETUP STEPS

SETUP STEPS

SETUP STEPS

SETUP STEPS

The unit should be level (left to right and front to back), located on a solid counter top.  Connect a water line from the water filter
to the brewer. NOTE: Some type of water filtration device must be used to maintain a trouble-free operation. (In areas with
extremely hard water, we suggest that a sedimentary and taste & odor filter be installed.) This will prolong the life of your brewing
system and enhance coffee quality.

1. A 3/8” NPT x 1/4” Flare elbow has been supplied for water line connection.  Use tubing sized sufficiently to provide a

minimum of 1.0 GPM.

2. To hookup the InterLock grinder, Locate the  jack labeled “Class 2 Wiring Only” on brewer and grinder. Connect the two with

the cable plug.

3. Connect the unit to an appropriate electrical power circuit.
4. Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill.  When the water level in the

tank rises to the correct volume, the heating elements will energize automatically.  With ADS Systems there is no danger
of element burnout caused by an empty tank.

5. The heating tank will require 20 to 30 minutes to reach operating temperature (200°F) as indicated by the READY-TO-

BREW indicator.

6. Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
7.  Brew a cycle of at least 12 ounces, to purge the water lines of any air that may be trapped after filling.

The National Sanitation Foundation requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be moved

for cleaning underneath.

2. In some areas an approved backflow prevention device may be required between the brewer and the water supply.

W

W

W

W

W

ILBUR

ILBUR

ILBUR

ILBUR

ILBUR

 C

 C

 C

 C

 C

URTIS

URTIS

URTIS

URTIS

URTIS

 C

 C

 C

 C

 C

OMP

OMP

OMP

OMP

OMPANY

ANY

ANY

ANY

ANY

, I

, I

, I

, I

, I

NC

NC

NC

NC

NC

.....

WILBUR CURTIS COMPANY

Montebello, CA 90640

Models Included

GEM-612ILD
GEM-600ILD
TL-9002
TL-9001

CAUTION: 

CAUTION: 

CAUTION: 

CAUTION: 

CAUTION: DO NOT
connect this brewer to
hot water. The inlet valve

is not rated for hot water.

CAUTION: 

CAUTION: 

CAUTION: 

CAUTION: 

CAUTION: Please use
this setup procedure
before attempting to use

this brewer. Failure to follow the
instructions can result in injury or
the voiding of the warranty.

WARNING

WARNING

WARNING

WARNING

WARNING  TO AVOID
SCALDING, Do not
remove brewcone while
brew light is flashing.

ISO 9001 REGISTERED

C

WARNING

 HOT LIQUID,

Scalding may occur.
Avoid splashing.

I M P O R

I M P O R

I M P O R

I M P O R

I M P O RTTTTTA N T

A N T

A N T

A N T

A N T:::::

Equipment to be
installed to comply with

applicable federal, state, or local
plumbing/electrical codes having
jurisdiction.

BREWING INSTRUCTIONS

BREWING INSTRUCTIONS

BREWING INSTRUCTIONS

BREWING INSTRUCTIONS

BREWING INSTRUCTIONS

1.  Brewer should be ON (Confirm at rear toggle switch, then press the ON/OFF button). Ready-to-Brew should be ON. If

 connected to an InterLock grinder, grinder should be on. If Interlocked, grind coffee at this time.

2.  Place an empty Satellite on the warmer deck, under the brewcone and press the warmer switch.

6. Press Brew button.

Brewing will begin
immediately.

5.  Transfer filled

brewcone to
brewer.

3. Place a clean filter

into the brewcone.

4. Fill brewcone with

ground coffee.

Reviews: