background image

Vent-A-Fume 

Vent-A-Kiln Corp.

 

 

Custom-Designed Hood and Blower Systems/Variable Height Kiln Exhaust Systems

 

 

Bench Mounted Ventilator 

 (Assembly Instructions) 

                                      

 

Note: a) Position of set screws for fittings (6), (7), (8) must be assembled as shown to avoid deflection of stand. 
          b) Horizontal support pipe (5) has two holes for J – bolt and 0.25” allen wrench. 

 

 

Assembly: 

Fasten flange (6) to work bench surface (

hardware not included

),  

set screw to face equipment being vented, 0.25” dia. holes are  
provided, larger holes may be drilled if desired. Insert 24.0” long  
support pipe (5) into flange (6), tighten set  
screw with 0.25” allen wrench provided.  
Slide coupling (7) half way over end of  
support pipe (5), set screws to face  
equipment being vented, tighten set  
screw. Insert 24.0” long support pipe  
(5) into coupling (7), tighten set screw.  
Slide crossover fitting (8) onto vertical  
support pipe (5), set screw to face  
down, tighten set screw and adjust  
position as needed. Insert 24.0” long  
horizontal support pipe (5) into  
crossover fitting (8) (holes in  
support pipe need to be in vertical  
position as shown), tighten set screw and  
adjust position as needed. Remove hex nuts  
and washers from (2) blower inlet studs. Position  
neoprene gasket (9) over blower studs and rest it  
on top of inlet safety screen. Align blower inlet  
studs with holes on top of collection hood (1), fasten  
blower (2) to collection hood (1) with hex nuts and  
washers. Mounting blower (2) and collection hood (1)  
assembly to support stand is a 

two person 

task. Slide J – bolt  

(12) into hole on blower hanging bracket and remove hex nut. Lift blower and collection hood 
assembly while a helper guides the J – bolt through end hole in horizontal support pipe (5), fasten 
with hex nut and adjust as needed to position blower outlet in desired location. Cut discharge hole 
in wall, for 5.0” diameter hole dimensions square or round not to exceed 5.25”, 6.0” diameter duct 
not to exceed 6.25”. Slide tail pipe onto louver (4) (sheet metal screws may be utilized to fasten 
louver to tail pipe for tighter fit) and fasten louver (4) to outside wall (

hardware not included

). 

System comes standard with 10 ft. of flexible hose, cut hose to shortest length permissible and 
install utilizing zip clamps provided. Collection hood clearance should be 2.0” – 4.0” above oven 
top for side swinging doors and collection hood should have enough clearance for vertical 
swinging doors. 

 
 

                          Any Questions or in need of assistance Please consult Factory 

 

Reviews: