Assembly instructions 

Rev. 01 - 13/08/2020

 

Pag. 1 / 2 

 

 

 

www.unistara.com 

 

 

 
 

 

 

 

Instructions 

 

 

1.

 

Build a strong masonry base considering the dimensions of the oven as per 
following schedule: 

 

Masonry support 

Pic
.1

 

 

 

 

 

 

 

Model 

 

Ø 140 

140 x 170 

 

Base width A [cm/

in

 200/

78.7

 200/

78.7

 

Base length B [cm/

in

 200/

78.7

 230/

90.6

 

Base Heigth H [cm/

in

 100/

39.4

 100/

39.4

 

 

2.

 

Carefully level the surface and build a 

brick curb

, 10 cm high and 10 cm thick. 

(Pic.2) 

 

Pic
.2

 

 

3.

 

Place the 

insulating bricks

 

inside the tank made. You can cut them, if 

necessary, with common wood cutting tools. (Fig.3)  
Insulating bricks must be dry placed, without cement or other binders, and 
without grouting the joints. 

 

Pic
.3

 

 

4.

 

Dry place the elements of the 

cooking floor

 close each other to the 

centre(Pic.4). 

 

Pic
.4

 

 

5.

 

Dry mount the 

vault

 and seal, only externally, all the joints between the 

elements, using the mortar supplied in the kit (Pic.5). 

 

Pic
.5

 

 

6.

 

Glue the 

flue fitting

, then cover the entire dome of the oven with the 

insulating blanket

 supplied in the kit (Pic.6). 

 

Pic
.6

 

 
 

 